Similar Projects
Animal Services Center- HVAC Kennel Upgrade And Re-Roof
Post-Bid
Las Cruces, NM 88001

Removal and Replacement of HVAC Systems
Post-Bid
Albuquerque, NM

Hood Cleaning Services
Results
Less than $13,830 est. value
Rio Rancho, NM 87124

Replacement of Wall Mounted Gas Furnaces in 34 Units
Results
Las Cruces, NM 88001

Replacement of Heating and Air Conditioning Units at the Sandstone Manor Apartments
Post-Bid
Roswell, NM 88203

HVAC and Plumbing Services District 6
Results
Santa Fe, NM

Ford Utilities Cooling Tower Repairs
Post-Bid
Albuquerque, NM 87131

Southern New Mexico Correctional Facility (SNMCF) Level 2 HVAC and Roof Replacement
Results
Las Cruces, NM 88004

S201--501- Kitchen Hood Cleaning
Post-Bid
Albuquerque, NM 87108

Clovis Civic Center HVAC Replacement
Results
Clovis, NM

Maintenance Shop Exhaust System-City Vehicle Services
Post-Bid
Gallup, NM 87301

HVAC systems at Dexter Elementary School
Results
Dexter, NM 88230

Repair or Replace HVAC/Chiller System at Luna Mimbres Museum
Post-Bid
Deming, NM 88030

HVAC Renovation of Building 1622
Renovation
Results
$1,000,000 to $5,000,000 est. value
NM

41--Refrigeration Unit, 90 Ton Cooling Capacity
Post-Bid
Las Cruces, NM 88002

Last Updated 04/20/2020 11:19 AM
Project Title

Heat Treat Furnace

Physical Address View project details and contacts
City, State (County) NM   (Otero County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall provide personnel, software, and parts to perform the following heat control system upgrades on the Accutherm Model BHA-364848-982 furnace: 1) Provide an updated furnace control panel with the following features: a. Software that can record the furnace cycles and temperatures on a 7 to 15 inch HMI touch screen. b. The software must include an EasyConverter application that is used to view data log files and event log files that are created by the HMI during operation. c. The EasyConverter application must be able to take a data or event log file and convert it into a Comma Separated Value (CSV) file that can be easily imported into other applications such as Microsoft Excel. d. The software must include data log files that are files the HMI creates when capturing data using the data sampling object. e. The software must include event log files that are history files the HMI creates when using the event (alarm) log object. 2) Replace the existing transformer with an 80 KVA or greater transformer. 3) Provide all of the parts required to assemble and integrate the updated panel and transformer on the Accutherm Model BHA-364848-982 furnace. 4) Install the updated furnace control panel and transformer on the Accutherm Model BHA-364848-982 furnace. 5) Conduct a functional test after upgraded panel and transformer installation to ensure proper operation. The test shall simulate normal operating conditions and shall be required to maintain no less than a specified amount of degrees Fahrenheit. The Contractor will be responsible for providing labor and needed parts to perform the upgrades.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Furnaces, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents