Similar Projects
Mary Ellen McCormack Apartments
New Construction
Conception
$1,500,000,000 est. value
Boston, MA 02127

Fenway Park Mixed-Use
New Construction
Conception
Boston, MA

Allston Yards
New Construction - 3,564,000 SF
Design
$110,000,000 est. value
Allston, MA 02134

Allston Yards
New Construction - 3,564,000 SF
Design
$110,000,000 est. value
Allston, MA 02134

Dresser Street Multi-Family
New Construction - 22,128 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Boston, MA 02127

Burbank Terrace
New Construction - 20,000 SF
Post-Bid
Boston, MA 02115

Government Center Garage Redevelopment
New Construction, Demolition - 2,310,100 SF
Construction
$2,200,000,000 est. value
Boston, MA

Government Center Garage Redevelopment
New Construction, Demolition - 2,310,100 SF
Construction
$2,200,000,000 est. value
Boston, MA

25 Sixth Street
New Construction - 71,000 SF
Pending Verification
Chelsea, MA 02150

840 Columbus Avenue
New Construction - 525,000 SF
Pending Verification
$10,000,000 CJ est. value
Boston, MA 02120

North End Cross Street Boutique Hotel
New Construction - 87,142 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Boston, MA 02114

Alexandra Hotel
New Construction, Renovation - 60,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
South End, MA 02118

Marine Wharf Hotel
New Construction - 320,000 SF
Construction
$160,000,000 est. value
Boston, MA 02127

Fifth Street Units
Renovation
Pending Verification
Chelsea, MA

157 - 163 Chestnut Street Redevelopment
New Construction
Conception
Chelsea, MA 02150

Reported 12/29/2021 08:35 AM
Project Title

425 Medford Street

Physical Address View project details and contacts
City, State (County) Boston, MA 02129   (Suffolk County)
Category(s) Commercial, Residential
Sub-Category(s) Hotel/Motel, Multi-Family Homes, Office
Contracting Method
Project Status Obtained from a Public Office
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Office, New Construction, Multi-Family Homes, New Construction, Hotel/Motel, 1,836,500 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Residential Equipment, Residential Appliances, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Treatments, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Rugs and Mats, Office Furniture, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents