Similar Projects
Babcock Trail Apartments
New Construction - 67,766 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Inver Grove Heights, MN 55077

Siegle Property Housing Development
New Construction
Conception
Waconia, MN 55387

Ardan Place Housing Development
New Construction
Design
Rosemount, MN 55068

West Quarter Lake Apartments
New Construction
Design
$224,000,000 est. value
Minneapolis, MN 55416

Frontenac State Park - Shower Building - Prime
New Construction
Bidding
Frontenac, MN 55026

Thompson County Park General Site Improvements
Bidding
$1,400,000 est. value
West Saint Paul, MN 55118

Inspection and Cleaning of Sanitary and Storm Water Piping
Term Contract
Post-Bid
Moorhead, MN 56563

Fort Ridgely State Park Amphitheater Safety Renovation
Renovation
Post-Bid
Less than $150,000 est. value
Fairfax, MN 55332

Petroleum Soil Excavation
Results
$300,000 est. value
Elbow Lake, MN 56531

Petroleum Soil Excavation
Results
$200,000 est. value
Greenbush, MN 56726

Millie Meadows Estates Phase 2
Construction
Rochester, MN 55902

Erik's Transmission
New Construction - 1,056 SF
Construction
MN

Conference Site Study & Design RFP
Renovation
Pending Verification
Hastings, MN 55033

CMC Retail Addition
New Construction, Addition - 20,000 SF
Pending Verification
Saint Cloud, MN 56301

Lake Minnetonka Care Center
Demolition - 17,983 SF
Design
Minnetonka, MN 55345

Last Updated 03/31/2021 05:45 AM
Project Title

Youth Athletic Complex Concessions Building Renovation and Site Work

Physical Address View project details and contacts
City, State (County) Elk River, MN 55330   (Sherburne County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work Includes Renovation of the Existing Concessions Building and Associated Sitework , also Included is Site Work Associated With a New Restroom Building to be Constructed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents