Similar Projects
Remove and Replace Existing Elevator Flooring
Renovation
Sub-Bidding
$350,000 CJ est. value
Chicago, IL 60604

Ericson ES_ACM Flooring Abatement Lunchroom and Corridors
Term Contract, Renovation
Sub-Bidding
$250,000 CJ est. value
Chicago, IL 60624

Seascape Pool Floor
Alteration
Post-Bid
Hoffman Estates, IL 60169

Flooring Replacement
Alteration
Post-Bid
Chicago Ridge, IL 60415

Des Plaines Boardroom Expansion/Renovation Athletic/Theater Wing Flooring Replacement
Term Contract
Results
Arlington Heights, IL

N072--Removal and Replacement of Existing Flooring
Term Contract
Results
Chicago, IL 60612

Southside Occupational Academy High School Vestibule Flooring ONLY PREQUALIFIED POOL Various Trades PLA for work over 25K
Renovation
Sub-Bidding
$40,000 CJ est. value
Chicago, IL 60636

Flooring Replacement at Andrew, Sandburg and Stagg High Schools
Alteration
Post-Bid
Orland Park, Palos Hills, Tinley Park, IL 60487

Gym Floor and Bleacher Replacement
Renovation, Alteration
Results
Streamwood, IL 60107

Carpet Replacement
Alteration
Post-Bid
Elk Grove Village, IL

Construction Services for carpet, floor, wood concrete and sub-floor
Alteration
Results
Chicago, IL 60661

2022 Floor Tile Abatement
Alteration
Post-Bid
La Grange, IL

Furnish and Installation of Flooring
Alteration
Results
IL

2022 Cutting Hall and Falcon Recreation Center Carpet Replacement
Alteration
Post-Bid
Arlington Heights, IL

Highcrest Middle School Flooring
Alteration
Results
$200,000 est. value
Wilmette, IL 60091

Last Updated 05/16/2023 03:40 PM
Project Title

Schurz-Gym Floors Resurface

Physical Address View project details and contacts
City, State (County) Chicago, IL 60641   (Cook County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Questions Due Date: Apr 13th 2023, 2:30 PM CDT Supply labor and materials to complete the following gym floor maintenance: Carpentry Services Sand and Resurface Shurz High School Gym Floor, Chicago 4,283 sq. ft. Re-sand to bare floor and repair/fill damaged boards. Apply two (2) coats of oil-based seal, repaint game lines to specifications. Apply two (2) coats of oil-based finish. Game Lines: (1) Basketball (1) Volleyball ** Requires access to 208-volt 3-phase 200amp electric. ** All equipment on the floor must be removed prior to work beginning. Bleachers must be closed (if present) ** Not responsible from damages resulting from premature use of the floor. ** Assumes ground-floor gym or use of an elevator for riding sander. Provide Labor and Materials:

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents