Similar Projects
The Link Apartments
New Construction
Conception
$80,000,000 est. value
Oakland, CA 94607

Developments at the Lake Merritt BART Station
New Construction - 524,700 SF
Conception
$100,000,000 est. value
Oakland, CA 94607

San Pablo Avenue Affordable Housing
New Construction - 27,000 SF
Design
Emeryville, CA 94608

2400 Adeline Condominium Development
New Construction - 45,750 SF
Design
$4,600,000 est. value
Oakland, CA 94607

Val Vista Underdrain Improvements
Infrastructure
Bidding
$1,750,000 CJ est. value
Pleasanton, CA 94566

Cold Plane, Place Ogfc and High Friction Surface Treatment
Infrastructure
Bidding
$2,720,000 CJ est. value
Sunol, CA 94550

La Vista Residential & The Primary School
New Construction, Infrastructure - 151,436 SF
Sub-Bidding
$75,000,000 CJ est. value
Hayward, CA 94544

La Vista Residential & The Primary School
New Construction, Infrastructure - 151,436 SF
Sub-Bidding
$75,000,000 CJ est. value
Hayward, CA 94544

SSM-THUP Project General Trades Contractor
New Construction, Alteration - 46,000 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Berkeley, CA 94703

Positive Location of Underground Utility Facility (Potholing) Services
Infrastructure
Post-Bid
$1,400,000 est. value

DVA Site Work and Geotechnical Mitigation for Alameda Columbarium and Outpatient Clinic and Conservation Management Office
Alteration
Results
$25,000,000 to $100,000,000 est. value
Alameda, CA

Hayward Maintenance Complex (Phase 2) Civil Grading
Infrastructure
Results
$20,000,000 to $40,000,000 est. value
Hayward, CA

The Launch Apartments
New Construction
Construction
$166,000,000 est. value
Alameda, CA 94501

Studio 2000
New Construction, Demolition - 43,567 SF
Construction
$10,000,000 est. value
Berkeley, CA 94704

Mixed-Use Building
New Construction - 57,600 SF
Pending Verification
$5,313,535 est. value
Berkeley, CA 94704

Last Updated 12/07/2022 08:12 PM
Project Title

Madrone Terrace - Remaining Trades

Physical Address View project details and contacts
City, State (County) San Leandro, CA 94578   (Alameda County)
Category(s) Education, Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Pre-School/Daycare, Site Development
Contracting Method Bids by Invitation
Project Status Sub-Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $17,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of a new affordable housing development that that spans over a non-construction easement for a sewer main and flood control channel. Project includes one floor operated by the Hayward Area Recreation and Park District (H.A.R.D.) for new community room spaces and a daycare. PLEASE NOTE: - The project is pursuing GreenPoint Rated Platinum - DEADLINE FOR BID RFIs: Friday, November 18, 2022 @ EOD. - Bidding status requested on CM Bidding Platform by Tuesday, November 15, 2022. - LABOR REQUIREMENTS: Reference Exhibit C. --Prevailing Wage (state or federal, higher of the two) for all trades / Union Labor required for carpenters, laborers, operating engineers only --Labor and Contract Compliance per Alameda County HCD Measure A1 is required, the compliance manual is included in Exhibit C.1. - EQUAL OPPORTUNITY WORK FORCE PARTICIPATION GOALS: The developer has committed to meeting the Alameda County HCD (Housing + Community Development) Measure A1 Labor and Contract Compliance program which includes: 25% Local Contracting (Alameda County LBE) and 20% Small Local Contracting (Alameda County SLBE); the basis of percentages is of the total County Measure A1 funding amount.

Details

,, 105,760 SF - 5 Stories Above Grade, 93,560 SF. Parking Spaces, 44 Parking Spaces. 1 Story Above Grade, 2,800 SF. 1 Story Above Grade, 9,400 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents