Similar Projects
Cowee Bald & Connelly Creek Culvert Replacements
Term Contract
Bidding
$100,000 to $250,000 est. value

Cowee Bald & Connelly Creek Culvert Replacements
Term Contract
Bidding
$100,000 to $250,000 est. value

Maple Street/Merritt Street Water Improvements Project
Post-Bid
Mount Airy, NC 27030

System A Storm Drain Improvements Project
Post-Bid
Harrisburg, NC 28075

Storm Drainage Improvements
Results
Greensboro, NC 27401

Chemical Grouting and Pipe Lining Services
Results
Charlotte, NC

Storm Water Repair and Improvement FY 2022-A
Infrastructure
Bidding
Charlotte, NC

Setliff Storm Drainage Improvements
Post-Bid
High Point, NC 27261

Reed Drive Stormwater Pipe and Appurtenance Repairs - Hurricane Florence Damages
Results
Less than $121,000 est. value
Emerald Isle, NC 28594

Storm Water Repair And Improvement Fy 2022-C
Infrastructure
Bidding
$4,197,355 est. value
Charlotte, NC 28206

Storm-Damaged Drainage System Engineering Services and Construction Repair Project
Post-Bid
Apex, Kinston, NC 27502

Underground Utility Repair
Term Contract
Results
Raleigh, NC 27610

1st Street Stormwater Improvements
Post-Bid
Beaufort, NC 28516

Hampton Avenue Storm Drainage Improvement Project
Results
$1,499,311 est. value
Charlotte, NC 28206

30 Market St. Sewer Relocation
Post-Bid
$340,000 est. value
Concord, NC

Last Updated 08/10/2021 10:11 AM
Project Title

Sulphur Springs Road Stormwater Improvement Project

Physical Address View project details and contacts
City, State (County) Asheville, NC 28806   (Buncombe County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $986,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this project is to address significant drainage issues along Sulphur Springs Road that cause flooding in the roadway at the low point of the basin (the intersection with an unnamed tributary of Hominy Creek). This project will install a new drainage system that addresses the issues and provides a system that can be upgraded with future projects along the contributing side streets. The culvert extension and associated stream stabilization will address existing slopes that exceed 2:1 at the roadway and provide a more sustainable stream bank that will not be as prone to erosion as the current situation.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents