Similar Projects
ComEd Vault Ventilation (Construction)
Infrastructure
Design
$100,000 to $250,000 est. value
Chicago, IL 60612

Bone Marrow Fan Replacement - Division 01 - General Work
Alteration
Bidding
$200,000 est. value
Chicago, IL 60612

HVAC Full-Service Preventative Maintenance
Alteration
Bidding
Country Club Hills, IL

Bridge Elementary School Window A/C Replacement
Alteration
Sub-Bidding
$200,000 est. value
Chicago, IL 60634

Harper College - Building Z Refrigerant Detection
Post-Bid
Palatine, IL 60067

OA Dampers at Bridge ES
Post-Bid
Chicago, IL 60634

HVAC Replacements at Sand Ridge Nature Center
Results
South Holland, IL 60473

Replacement of Rotunda Air Handling Units
Results
Chicago, IL

HVAC and Mechanical Products
Term Contract
Post-Bid

Damper Replacement Graham ES
Results
Chicago, IL 60609

CTE Mechanical Equipment at Prospect HS
Post-Bid
Mount Prospect, IL 60056

Bridge ES Filter Racks AHU #1, AHU #2
Results
Chicago, IL 60634

Robert Crown Center HVAC Maintenance
Post-Bid
Evanston, IL 60202

Filter Racks Stone ES
Results
Chicago, IL 60613

River Valley RTU Replacement in Lemont
Post-Bid
Chicago, Lemont, IL 60439

Last Updated 05/17/2022 11:25 PM
Project Title

Furnish and Install Make Up Air Unit at Bridges Of Poplar Creek

Physical Address View project details and contacts
City, State (County) Hoffman Estates, IL 60169   (Cook County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish and Install of Make Up Air Unit at Bridges of Poplar Creek Mobilization of all equipment and tools to the job site. Locate all existing utilities and notify owner of any disconnects that would be needed. Evacuate refrigerant from existing units according to EPA guidelines. Isolate and disconnect existing REZNOR make up unit. Demo and remove existing make up air unit and curb from rooftop and leave on site for the owner to discard. Furnish and install new makeup air unit that matches existing BTU's and CFM (same size), connecting all piping and drainage to the unit. Connect new unit to existing electrical and existing condenser units (2). Perform Startup of new units and existing units, test and verify operations.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents