Similar Projects
Rehabilitate Runway 12-30 at Altoona-Blair County Airport
Bidding
Martinsburg, PA 16662

Taxiway `N` Rehabilitation Project at Pittsburg International Airport
Bidding
Pittsburgh, PA 15231

Arnold Palmer Regional Airport - Apron Strengthening
Post-Bid
Latrobe, PA 15650

Rehabilitate T-Hangar Taxiway
Post-Bid
Greenville, PA 16125

Rehabilitate Apron, Phase II - Construction
Results
Bloomsburg, PA

Construction of Rehabilitate Taxiway D (East)
Results
Avoca, PA 18641

Rehabilitate Runway 4-22
Renovation
Construction
Factoryville, PA 18419

University Park Airport Rehabilitate Taxiway A
Renovation - 1,700 SF
Construction
State College, PA 16803

Runway 8-26 Rehabilitation Phase IV Bid Package 2
Bidding
Lititz, PA

Rehabilitate Runway (Crack Seal and Remarking Including Taxiway)
Post-Bid
Shippenville, PA 16254

Rehabilitate Airport Access Road
Results
Paxinos, PA 17860

Taxiway F Rehabilitation
Bidding
Lemont Furnace, PA

Zelienople Municipal Airport: Phase 1, Rehabilitate Runway 17-35
Post-Bid
Zelienople, PA 16063

Crack Seal and Re-Mark Airport Pavements
Results
Mercer, PA 16137

Realignment of Taxiway P (Between Taxiways U and N)
Bidding
$5,000,000 est. value
Philadelphia, PA 19153

Last Updated 04/22/2021 11:20 AM
Project Title

Harrisburg International Airport Cargo Apron Expansion, Phase IV Drainage and New Outfall

Physical Address View project details and contacts
City, State (County) Middletown, PA 17057   (Dauphin County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Drainage and New Outfall project is part of a multi-year, multi-construction package. Phase IV work consists of drainage installation from Taxiway G to the Susquehanna River. This proposed drainage construction includes installation of 68-inch by 43-inch, and 83-inch by 53-inch elliptical concrete pipe, 30-inch , 42-inch, and 60-inch reinforced concrete pipe, an 84-inch by 60-inch concrete box culvert, a new outfall end section to the Susquehanna River. Other utility work includes relocation of a sanitary force main. The 84-inch by 60-inch box culvert outfall will be constructed through the levee into the River. The contractor will need to salvage the articulated concrete block system through the project area and replace it upon completion of the reconstructed levee. A cofferdam needs to be placed to protect the Airport from the River while the levee construction is ongoing. The proposed drainage system under Runway 13-31 includes twin 60-inch reinforced concrete pipes constructed utilizing microtunneling and then jacked under Runway 13-31. Prior to the microtunneling, respective grouting improvements plan will be conducted beneath the runway. This microtunneling construction work will be completed in order to maintain and preserve Runway 13-31’s function and use. The drainage system installation under Taxiway A will be performed utilizing the cut and cover method to install 83-inch by 53-inch elliptical concrete pipe. The segment of Taxiway A removed will need to be reconstructed. This work also includes reconstruction of the centerline lighting and underdrain system. The drainage system segment from Taxiway A to Taxiway G includes installation of 68-inch by 43-inch elliptical concrete pipe installation via cut and cover as well. The project includes specific and detailed construction phases to minimize impacts to airport operations. HIA Runway 13-31 will remain active during construction with the exception of scheduled nightly closures. The contractor will adhere to all FAA regulations including Runway Safety Areas (RSA), clearances and object free zones. Airfield lighting, NAVAIDs, and active power and communication cannot be disturbed unless called out in the plans.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents