Similar Projects
2022 Bond - Bellingham School District
New Construction, Renovation, Infrastructure
Conception
$122,000,000 CJ est. value
Bellingham, WA 98225

SR 539/Bay-Lyn Dr to International Boundary - Corridor Improvements
Infrastructure
Conception
$27,000,000 CJ est. value
Lynden, WA 98264

Main Street Corridor Reconstruction / Lynden
Infrastructure
Design
$200,000 CJ est. value
Lynden, WA 98264

I-5/Squalicum Creek to SR 539 - Bridge Deck Overlays
Infrastructure, Renovation
Design
$989,000 CJ est. value
Bellingham, WA 98229

North Lake Samish Drive Bridge No. 107 Replacement
Demolition, New Construction, Infrastructure
Bidding
$11,500,000 CJ est. value
Bellingham, WA 98229

Hundred Acre Wood Phase 1 RFQ
Infrastructure
Bidding
$1,000,000 CJ est. value
Bellingham, WA 98225

RFP - Boardmill Redevelopment Opportunity
New Construction, Infrastructure - 44,000 SF
Post-Bid
$1,500,000 CJ est. value
Bellingham, WA 98225

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

Pepin Creek / Main Street Bridge
Infrastructure
Results
$3,069,392 CJ est. value
Lynden, WA 98264

Lummi Island Dolphin Repair
Infrastructure
Results
$275,000 to $375,000 est. value
Bellingham, WA

I-405, NE 85th Street Interchange and Inline BRT Station Project
Infrastructure
Construction
$234,432,000 CJ est. value
Kirkland, WA 98033

Valencia Street Watermain
Infrastructure
Construction
$4,000,000 CJ est. value
Bellingham, WA 98229

Peace Health St. Joseph Medical Center Peter H. Paulsen Pavilion
Addition, Demolition, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Bellingham, WA 98225

State Street Creamery
New Construction, Infrastructure - 8,400 SF
Pending Verification
$39,000,000 CJ est. value
Bellingham, WA 98225

Tromp Road - City of Lynden
Infrastructure
Conception
$1,000,000 CJ est. value
Lynden, WA 98264

Last Updated 10/09/2023 01:02 PM
Project Title

Bellingham Shipping Terminal Marine Infrastructure and Dredging

Physical Address View project details and contacts
City, State (County) Bellingham, WA 98225   (Whatcom County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Question Deadline 08/31/2023 at 5:00 PM PT Engineers estimate: $18,000,000 - $20,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Each bid must be accompanied by a cashier's check, money order, or an original signed and stamped surety bid bond in an amount not less than five percent (5%) of the total bid, made payable to the Port of Bellingham. The successful Contractor / Vendor will be required to comply with the bonding requirements of RCW 39.08.010. If a Payment and Performance Bond is used to fulfill this requirement, the successful Contractor / Vendor shall use owner provided Payment and Performance Bond form and shall execute and deliver to the Port of Bellingham the bond or other surety for one hundred percent (100%) of the bid amount for the entire project in compliance with RCW 39.08.010. The Contractor is also responsible for forwarding copies of Payment and Performance Bonds to all sub-contractors, suppliers and all other service providers as requested. The Port of Bellingham reserves the right to reject any or all bids and to waive any irregularities or informalities. The contractor shall procure all necessary permits (unless otherwise instructed by the Port), pay for the same, and obtain all official licenses for the construction of the work and for temporary obstructions, enclosures and opening of streets for pipes, walls, etc., arising from the construction and completion of the work as mentioned in the specifications. The contractor shall be responsible for all violations of the law for any cause in connection with the construction of the work or obstructing streets, sidewalks, etc., and shall give all requisite notices to public authorities. To be filed immediately by the Prime Contractor after Contract is awarded and before work begins and subsequently by all those providing labor on the project. Demolition and waste haul of a portion of the Central Terminal wharf. o Installation of temporary and permanent electrical and mechanical utilities and modifications to existing utilities. o Dredging, hauling and disposal at a Subtitle D landfill of contaminated sediment located within Whatcom Waterway and under the wharf deck along South, Central, and North Terminals. Placement of a clean sand "residual management cover" (RMC) layer over dredged intertidal sediment areas. o Construction of a new steel pile supported concrete deck heavy lift wharf area within the footprint of the existing Central Terminal wharf o Selective demolition and repair of timber piles, decking, and bracing at the South Terminal pier.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents