Similar Projects
Beaver Creek New Raw Water Pump Station And Intake - Rivanna Water and Sewer Authority
New Construction, Infrastructure
Conception
$15,152,000 est. value
Charlottesville, VA

Briarfield Park - City of Hampton
New Construction, Alteration
Conception
$1,200,000 est. value
Hampton, VA 23661

Materials for Water, Sewer and Storm Water Installation
Term Contract
Bidding
Lynchburg, VA

Manhole Frame and Cover Replacement
Term Contract
Post-Bid
Roanoke, VA

Drain Line Replacement - VIP
Infrastructure
Post-Bid
$400,000 est. value
Norfolk, VA 23508

Stormwater Basin Maint - Martinsville
Results
Martinsville, VA

Stormwater Basin Maint - Martinsville
Results
Martinsville, VA

Billy Woods Canal (Butler Farm Road Wet Ponds) - City of Hampton
Infrastructure
Conception
$5,800,000 est. value
Hampton, VA 23666

Christiansburg High School Bus Loop and Utility Relocation
Infrastructure
Post-Bid
$750,000 est. value
Christiansburg, VA 24073

Storm Water Maint - Salem Residency
Term Contract
Results

900 Block Hunt Avenue - 1065 - City of Roanoke
Infrastructure
Conception
$620,000 est. value
Roanoke, VA 24012

Greenbrier Park Stormwater and Trailhead
Renovation, Infrastructure
Post-Bid
$300,000 est. value
Charlottesville, VA 22901

Pipe Rehabilitation - Martinsville
Term Contract, Infrastructure
Results
Bassett, VA 24055

Turner Fairbank Highway Research Center Project VA ST TFHRC 50(5)
Infrastructure
Post-Bid
$2,000,000 to $5,000,000 est. value
McLean, VA 22101

Blue Ridge Farms Phase 4 - Water, Sanitary, Storm Sewer and Sidewalk Improvements
Infrastructure
Results
Lynchburg, VA

Reported 07/12/2022 04:09 PM
Project Title

Aberdeen Gardens Drainage Improvements - City of Hampton

Physical Address View project details and contacts
City, State (County) Hampton, VA 23669   (Hampton City County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2026
Bids Due View project details and contacts
Estimated Value $1,900,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Improvements to curb and gutter, drainage system upgrades and mill and paving of streets throughout the Aberdeen Gardens neighborhood. This project consists of four (4) phases over multiple years. This project is included in the city's 2023-2027 Capital Improvement Plan (CIP). As of July 08, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents