Similar Projects
FY22 Park Forest Road Upgrade
Infrastructure
Post-Bid
MN

Tamarack Forest Road Upgrade
Infrastructure
Post-Bid
Sandstone, MN

District Wide Bituminous Seal Coat
Results

Grading, Full Depth Reclamation, Mill and Bituminous Surfacing, Lighting, and ADA Improvements 3.883 Miles
Results
MN

Chengwatana Road Upgrade
Infrastructure
Post-Bid
Sandstone, MN

Bituminous Milling and Reclamation, Bituminous Surfacing, Turn Lane and Aggregate Surfacing
Results
MN

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

Highway Construction
Infrastructure
Results
MN

Foundation Repairs and Grading Modifications
Infrastructure
Post-Bid
Pine City, MN

Pavement Rehabilitation at Sandstone Truck Station
Infrastructure
Results
$225,000 est. value
Sandstone, MN 55072

2022 Pavement Improvements
Infrastructure
Post-Bid
$507,000 est. value
Pine City, MN

Seal Bituminous Cracks
Infrastructure
Results

Work Associated With the Maintenance of the Townships Approximately 49 Miles of Roads
Infrastructure
Post-Bid
$5,000,000 est. value
Sturgeon Lake, MN

Grading, Bituminous Surfacing, Retaining Walls, Noise Walls, Ada Improvements, Signals, Lighting, Tms and Bridge Nos
New Construction, Infrastructure
Results

Alma Razor Road Rehabilitation
Infrastructure
Post-Bid
$600,000 est. value
Hinckley, MN 55037

Last Updated 09/19/2022 09:37 AM
Project Title

Rydberg & Sons Inc Outdoor Storage

Physical Address View project details and contacts
City, State (County) Pine City, MN 55063   (Pine County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for an outdoor storage area expansion for the existing excavating contractor including fencing, paved parking, and landscaping on five acres near the existing building. As of September 19, 2022, the project is currently seeking a conditional land use permit from Pine City. The owner is acting as the contractor. While a firm construction timeline has not yet been determined, construction is not expected to commence prior to the fourth quarter of 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents