Similar Projects
Paint Perimeter Fencing at Breece-Lock, Foster Heights, and Miller Square
Alteration
Post-Bid
Monroe, LA

Fencing Material
Alteration
Post-Bid
New Orleans, LA

Post-Disaster Fencing
Alteration
Results
New Orleans, LA

Fencing Materials for DOC
Alteration
Results
Angola, LA

Remove and Dispose of Existing Gates and Supply and Install One Cantilever Slider Gate With Electric Opener
Alteration
Post-Bid
Gretna, LA

Tyler Street Complex Fence
Alteration
Results
$30,000 est. value
Mandeville, LA

Labor, Materials and Equipment Necessary to Install New Corrugated Fencing for the Jefferson Parish General Services Department
Alteration
Post-Bid
LA

Cedar Fence Chain Link Fence Reapir
Alteration
Results
$62,000 est. value
Shreveport, LA

Labor, Materials and Equipment Necessary to Repair Fence for the Department of Sewerage
Alteration
Post-Bid
LA

Hurricane Laura Storm Repairs Park Fencing Repairs
Alteration
Results
Lake Charles, LA

Repair Chain Link Fence for the Streets Department
Alteration
Post-Bid
LA

Caney Lake Gate Repair
Alteration
Results
$500,000 to $1,000,000 est. value
LA

Exterior Improvements - Perimeter Fence
Alteration
Post-Bid
LA

Repair Fence for the Department of Sewerage
Alteration
Results
Gretna, LA

Waterman SSC- 10 Slide Canal Gate
Alteration
Post-Bid
Gonzales, LA

Last Updated 01/26/2023 05:31 PM
Project Title

Hurricane Laura Security Fencing Repairs, Phase I Allen Correctional Center

Physical Address View project details and contacts
City, State (County) Kinder, LA 70648   (Allen County)
Category(s) Single Trades
Sub-Category(s) Fencing
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $379,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

ANY PERSON REQUIRING SPECIAL ACCOMMODATIONS SHALL NOTIFY FACILITY PLANNING AND CONTROL OF THE TYPE(S) OF ACCOMMODATION REQUIRED NOT LESS THAN SEVEN (7) DAYS BEFORE THE BID OPENING. FOR: Hurricane Laura Security Fencing Repairs, Phase I Allen Correctional Center Kinder, Louisiana Complete Bidding Documents for this project are available in electronic form. They may be obtained without charge and without deposit from Corne Wilson Architects. Printed copies are not available from the Designer but arrangements can be made to obtain them through most reprographic firms. Plan holders are responsible for their own reproduction costs. Questions about this procedure shall be directed to the Designer at: Corne Wilson Architects A Professional Architectural Corporation 111 Rue Jean Lafitte Suite 105 Lafayette, LA 70508 Telephone: 337-232-0773 E-mail: info@cornewilsonarchitects.com All bids shall be accompanied by bid security in an amount of five percent (5.0%) of the sum of the base bid and all alternates. The form of this security shall be as stated in the Instructions to Bidders included in the Bid Documents for this project. The successful Bidder shall be required to furnish a Performance and Payment Bond written as described in the Instructions to Bidders included in the Bid Documents for this project. Bids shall be accepted from Contractors who are licensed under LA. R.S. 37:2150-2192 for the classification of Building Construction or Fencing. Bidder is required to comply with provisions and requirements of LA R.S. 38:2212(B)(5). No bid may be withdrawn for a period of forty-five (45) days after receipt of bids, except under the provisions of LA. R.S. 38:2214. The Owner reserves the right to reject any and all bids for just cause. In accordance with La. R.S. 38:2212(B)(1), the provisions and requirements of this Section and those stated in the bidding documents shall not be waived by any entity. When this project is financed either partially or entirely with State Bonds or financed in whole or in part by federal or other funds which are not readily available at the time bids are received, the award of this Contract is contingent upon the granting of lines of credit, or the sale of bonds by the Bond Commission or the availability of federal or other funds. The State shall incur no obligation to the Contractor until the Contract Between Owner and Contractor is fully executed. Facility Planning and Control is a participant in the Small Entrepreneurship (SE) Program (the Hudson Initiative) and the Veteran-Owned and Service-Connected Disabled Veteran-Owned (LaVet) Small Entrepreneurships Program. Bidders are encouraged to consider participation. Information is available from the Office of Facility Planning and Control or on its electronically

Details

Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents