Similar Projects
Shoreline Storage Tunnel Project
Bidding
$213,500,000 est. value
Cleveland, OH

Zoar Levee System Repairs, Zoar, OH
Post-Bid
Zoar, OH

Lower Olentangy Tunnel
Post-Bid
Columbus, OH 43215

Western Campus Tunnel Removal and Presser Hall Bridge Rehabilitation
Results
Less than $1,435,000 est. value
Oxford, OH

Lockington Dam Right Wall Drain System and Concrete Repair Project
Results
Less than $2,614,347 est. value
Lockington, OH 45356

Cleveland Bulk Terminal Ore Conveyance Tunnel Extension Project - Phase B
Post-Bid
Cleveland, OH

Muskingum River Lock and Dam No. 7 Mcconnelsville Dam Replacement Design/Build
Results
Less than $7,300,000 est. value
McConnelsville, Minerva Park, OH 43229

Tainter Gate Parallel Shaft Speed Gear
Post-Bid
Delaware, OH 43015

Village of Crooksville Reservoirs No. 1 and No. 2 Dam Breach Project
Results
Less than $250,000 est. value
Crooksville, OH 43731

Youngstown Dam Removals Project
New Construction
Post-Bid
Youngstown, OH

Southeast Dam Package - Veto Lake Dam Rehabilitation Project
Results
Less than $3,201,879 est. value
Belpre, OH 45714

2020 Pedestrian Tunnel Maintenance
Renovation
Post-Bid
$540,000 est. value
Dublin, OH

Hoover Dam Improvements- Part 1
Results
Less than $15,381,250 est. value
Columbus, OH

Statewide Dam Improvements CMAR
Results
Less than $17,930,000 est. value
Celina, Circleville, Lake Milton, Van Buren, OH

Cleveland Bulk Terminal Ore Conveyance Tunnel Permanent Material Design Build Contract
Results
$2,881,518 est. value
Cleveland, OH 44113

Last Updated 03/13/2020 08:30 AM
Project Title

Southeast Dam Package - Tycoon Lake Dam Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Belpre, OH 45714   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,201,879
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is located in southeast Ohio at Tycoon Lake Wildlife Area; N 38°55'42.51", W 82°20'51.03". To reach Tycoon Lake Dam from Rio Grande, take State Route 325 north for 1.0 mile, turn right onto State Route 554 for 2.0 miles, turn left on Tycoon Rd for 1.6 miles to arrive on site. The project involves excavation and replacement of failed embankment material on the downstream slope, construction of an auxiliary spillway near the left abutment, slip-lining the existing spillway, installation of seepage berm, and improvements to the lake drain structure.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents