Similar Projects
Last Updated | 11/13/2019 03:21 PM |
Project Title | J--Batavia Boiler Plant Work (Va-19-00027248) |
Physical Address | View project details and contacts |
City, State (County) | Batavia, NY 14020 (Genesee County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Vendor shall follow the manufacture s repair and maintenance guidelines and perform the requested services. The Vendor shall furnish all materials and parts in need of replacement, and remove (dispose) of old materials and parts in accordance with local/state/federal policy and regulations. The following shall be conducted, and any other task pertains to this requirement must be documented: Repair Boiler Plant deficiencies discovered during Boiler Plant Combustion Tuning / Commutation Testing and Safety Device Testing. Contractor shall check all four (4) boilers for repair and maintenance; furnish all associated equipment to correct boiler plant deficiencies. Re-stroke all air dampers and oil valve low fire switches that need adjustments, and/or out of specification. Install current relays on all three (3) blower motor legs, and tie into 3-P limit string. Furnish and install new stack damper actuator and pin outlet exhaust damper to shaft. Recalibrate O2 sensors. Drill and pin fuel oil control valve actuators. Perform boiler specific repair and maintenance: Boiler #2 Furnish and install new Warrick LWCO head Furnish and install new ASCO upstream pilot solenoid valve Boiler #3 Furnish and install new main vent valve on the gas train valve Furnish and install new ASCO upstream pilot solenoid valve Boiler #4 Furnish and install new ASCO upstream pilot solenoid valve Safety Controls Shall perform safety control checks, test functionality of boilers, and inform the COR of any immediate concerns, and make recommendations of forth coming repair and maintenance services. All safety devices must be checked in accordance with the criteria for a setpoint as defined herein VHA Boiler and Associated Plant Safety Testing Manual Forth Edition. Gas and Electric Check gas lines and connections Check gas mixture and linkage Check ignitions Check plugs, wires, and connections Operation Shall test run boilers and confirm proper operation in accordance with the local, state, and federal regulations; must adhere to VA guidelines and polices. Shall provide full reports (hard copy and electronic) of service performed. Shall inform the COR of any devices and/or equipment failing safety requirement/standard, and provide recommendation to remedy the findings. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |