Similar Projects
Pearl Place
New Construction, Infrastructure - 43,000 SF
Conception
$3,100,000 CJ est. value
Santa Rosa Beach, FL 32459

Pearl Place
New Construction, Infrastructure - 43,000 SF
Conception
$3,100,000 CJ est. value
Santa Rosa Beach, FL 32459

Bishop Landing
New Construction, Infrastructure
Design
$79,800,000 CJ est. value
Santa Rosa Beach, FL 32459

Bishop Landing
New Construction, Infrastructure
Design
$79,800,000 CJ est. value
Santa Rosa Beach, FL 32459

Grayton Beach Transit Facility
New Construction, Infrastructure - 4,772 SF
Bidding
$2,155,000 CJ est. value
Santa Rosa Beach, FL 32459

Grayton Beach Transit Facility
New Construction, Infrastructure - 4,772 SF
Bidding
$2,155,000 CJ est. value
Santa Rosa Beach, FL 32459

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Hewett Bayou Connector Road - Walton County
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Defuniak Springs, FL 32435

Silicone Joint Sealer
Infrastructure
Results

SR 8 (I-10) Milling and Resurfacing
Infrastructure
Results
$12,099,770 est. value
Defuniak Springs, FL 32435

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Stow Away Storage Expansion
New Construction, Infrastructure - 96,800 SF
Construction
$10,500,000 CJ est. value
Freeport, FL 32439

TownePlace Suites / Miramar Beach
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Miramar Beach, FL 32550

TownePlace Suites / Miramar Beach
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Miramar Beach, FL 32550

Retreat at the Bay
New Construction, Infrastructure - 17,600 SF
Conception
$51,400,000 CJ est. value
Santa Rosa Beach, FL 32459

Last Updated 02/20/2024 09:50 AM
Project Title

Eastern Lake Road Municipal Parking

Physical Address View project details and contacts
City, State (County) Santa Rosa Beach, FL 32459   (Walton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $502,673 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Eastern Lake Road Municipal Parking consists of 0.48 acres located on Eastern Lake Road between May Drive and Dalton Drive within the county limits of Walton County. The project is situated on two adjacent parcels which are currently owned by Walton County. The owner wishes to develop the two parcels into a parking area for beach access. Improvements to the site include parking facilities, sidewalks, stormwater management facilities and landscaping. Last date to submit questions is November 30th, 2022, no later than 12:00 Noon. All questions are to be directed in writing to waljames@co.walton.fl.us. DIRECTING QUESTIONS TO ANY OTHER STAFF, PROJECT ENGINEER AND ANY OTHER PERSON IS PROHIBITED AND WILL RESULT IN BID BEING DISQUALIFIED. Questions received after such date and time will not be answered. Bidder is responsible for the delivery of its bid. Bids received after the specified day and time will not be opened. Contractor shall substantially complete the Project within ONE HUNDRED FIFTY (150) calendar days of issuance of the Notice to Proceed. Final completion of the project shall be accomplished within THIRTY (30) calendar days from the date a punch list of the remaining items to be completed is issued by the County. Failure to achieve substantial completion within the designated time may result in the County imposing liquidated damages in the amount of ONE THOUSAND ONE HUNDRED NINETY-SIX AND 00/100THS DOLLARS ($1,196.00) per day. Failure to achieve final completion within the designated time may result in the imposition of liquidated damages of FIVE HUNDRED NINETY-EIGHT AND 00/100THS DOLLARS ($598.00) per calendar day and shall accrue until Application for Final Payment has been approved by the County

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents