Similar Projects
Yellowstone Academy
Renovation - 3,000 SF
Design
$1,700,000 est. value
Houston, TX 77004

Western Academy Gymnasium
New Construction - 9,122 SF
Design
$2,000,000 est. value
Houston, TX 77080

Contracted Services and Related Products - Supplemental
New Construction
Bidding
Baytown, TX

HJISD Replacement Facilities Project
New Construction
Bidding
Sour Lake, TX 77659

Package E Additions and Renovations for CMAR
Renovation, Addition
Post-Bid
Pearland, TX

21st Century Learning Renovations, Roof Replacements, MEP Upgrades, Grading Improvements, and Accessibility Improvements - Phase II
Renovation
Post-Bid
Less than $17,433,799 est. value
Kerrville, TX

Spring Oaks Middle School Renovation
Renovation
Results
$5,400,000 est. value
Houston, TX

Multi-Campus Kitchen Renovation Project
Renovation
Results
$1,500,000 est. value
Austin, TX 78729

Construction of New Middle School
Construction
Stafford, TX 77477

New Gymnatorium
New Construction
Construction
McKinney, TX

Metal Buildings
New Construction
Bidding
Ivanhoe, TX 75447

Van Vleck Auditorium & Gym Renovation
Renovation - 26,710 SF
Post-Bid
$3,300,000 est. value
Van Vleck, TX

Job Order Contract for General Construction
Term Contract
Results
Round Rock, TX

Southwest High School Renovation
Renovation
Construction
Less than $28,507,500 est. value
Fort Worth, TX 76133

Midway Isd Woodgate Intermediate Renovations Phase 1 - Package 2
Renovation
Bidding
Less than $1,800,000 est. value
Woodway, TX 76712

Reported 03/24/2021 10:57 AM
Project Title

New Girl’s Field House

Physical Address View project details and contacts
City, State (County) Diana, TX   (Upshur County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method
Project Status Construction Commenced March 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the new construction of an approximately 5,600 sf field house facility on District owned property. In general, the site work will include rough grading, utility connection/coordination, subsurface drainage work, new concrete paving, and landscaping associated with new building construction. Building construction consists of slab on grade on engineered building pad, pre-engineered metal building structure, masonry wainscot and prefinished metal panel veneer, and standing seam metal roofing. Interior finishes included painted masonry and gypsum board walls; flooring consisting of sealed concrete floors, carpet tile, and vinyl tile; architectural millwork, suspended acoustical and framed gypsum board ceilings, HVAC, plumbing, and electrical.

Details

Middle/Senior High School, 5,600 SF New Construction.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents