Similar Projects
Smalley St - Richmond to Lieg - City of Shawano
Infrastructure
Conception
$300,000 CJ est. value
Shawano, WI 54166

Smalley St - Richmond to Lieg - City of Shawano
Infrastructure
Conception
$300,000 CJ est. value
Shawano, WI 54166

CBRF Upper and Lower Level Parking Lots
Infrastructure
Bidding
Gresham, WI 54128

CBRF Upper and Lower Level Parking Lots
Infrastructure
Bidding
Gresham, WI 54128

LRIP Asphalt
Infrastructure
Post-Bid
$410,000 est. value
WI

2022 Cedar Street and Patches - Project 1
Infrastructure
Post-Bid
$3,000,000 est. value
Tigerton, WI 54486

Storm Sewer Construction Warrington Avenue
Infrastructure
Results
$161,839 CJ est. value
Cecil, WI 54111

Runway 30 PAPI to be installed in 2023
Infrastructure
Results
$121,145 CJ est. value
Shawano, WI 54166

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Perpetuation - Resurfacing. STH 66 - Wisconsin Department of Transportation
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Shawano, WI 54166

Perpetuation - Resurfacing. STH 66 - Wisconsin Department of Transportation
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Shawano, WI 54166

2022 Cedar Street and Patches - Project 4
Infrastructure
Post-Bid
$200,000 est. value
Tigerton, WI 54486

2022 Cedar Street and Patches - Project 3
Infrastructure
Post-Bid
$200,000 est. value
Tigerton, WI

2022 Cedar Street and Patches - Project 2
Infrastructure
Post-Bid
$800,000 est. value
Tigerton, WI 54486

Last Updated 09/12/2023 03:38 PM
Project Title

Bonduel - Cecil Const / Pavement Replacement

Physical Address View project details and contacts
City, State (County) Bonduel, WI 54107   (Shawano County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

20230912013 9220-04-72 Bonduel - Cecil, Express Way to Mutzy Lane, STH 117 Shawano County 9220-04-82 Bonduel - Cecil, Express Way to Mutzy Lane, STH 117 Shawano County Work Summary: Excavation, Base, HMA Pavement, Retaining Walls, Culvert Pipe, Curb and Gutter, Sidewalk, Storm Sewer, Signs, Pavement Marking, Traffic Signals, Water Main, Sanitary Main. Work Type: AK DBE Goal: 0 % Completion Date Contract: 65 Days Guaranty Required: $ 75,000.00 Estimate Anticipated Funding $1,000,000 - $1,999,999 With each sealed proposal, the bidder must include a properly executed bid bond or a cashiers check, certified check, banks check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. The bidder may also satisfy the proposal guaranty requirements by having a properly executed annual bid bond on file with the Department. Contractors should submit all questions concerning plans and/or proposals through Website. This process is documented and can be found at Website. WI DOT - 013 - Bonduel - Cecil Const / Pavement Replacement

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents