Similar Projects
Lake City Land Banked Site Park
Demolition, Infrastructure, Alteration
Post-Bid
Seattle, WA 98125

Facilities Landscape Maintenance
Infrastructure
Bidding
$45,000 est. value
Sammamish, WA

North South Monument Site Development
New Construction, Infrastructure, Alteration
Results
Bremerton, WA

Parks Landscape Maintenance
Alteration
Bidding
$225,000 est. value
Sammamish, WA

Landscaping Care and Grounds Maintenance Services
Alteration
Bidding
$170,000 est. value
Tacoma, WA 98408

Woods Creek - Circuits 12-1808 & 12-1811 - Distribution and Transmission Line Clearance
Infrastructure
Results
$900,000 est. value
Monroe, WA 98272

Annual Contract - Landscaping Services
Term Contract
Bidding
WA

Mulch, Bark and Wood
Alteration
Post-Bid
WA 98201

Tree Pruning and Removal
Alteration
Post-Bid
$2,500,000 est. value
Vancouver, WA 98687

Douglas Truth Branch Library Access Improvements
Renovation, Infrastructure, Alteration - 18,848 SF
Bidding
$450,000 to $500,000 est. value
Seattle, WA 98122

Tree Services
Alteration
Post-Bid
$75,000 to $100,000 est. value
Port Orchard, WA

Reported 10/01/2021 12:00 AM
Project Title

Transmission and Distribution Line Clearance

Physical Address View project details and contacts
City, State (County) Everett, WA 98213   (Snohomish County)
Category(s) Industrial/Manufacturing, Single Trades
Sub-Category(s) Landscaping/Irrigation, Power Lines
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $182,735
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work to be performed is located in the vicinity of Mill Creek, Maltby, Sultan and Gold Bar in Snohomish County, Washington. The specific work location commences from Cascade Substation and goes South along Seattle Hill Road, West along 132nd Street SE and South along 35th Avenue SE; from Turner’s Corner Substation and goes East along Maltby Road; from Thrashers Corner Substation and goes East along Maltby Road; from Woods Creek Substation and goes East along Hwy 2; from Sultan Substation and goes East along Hwy 2, and includes all associated taps, as indicated on Attachments I and II. The total distance to be covered on this project is approximately 23.8 pole miles. Provide all labor, materials, and equipment necessary to prune, cut, treat, remove, clear, and dispose of trees and brush, as well as perform reseeding work, under and along the district's transmission and distribution system

Details

Division 26 - Electrical, Common Work Results for Electrical, Control-Voltage Electrical Power Cables.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents