Similar Projects
Yazoo River Basin, Rocky Bayou, Yazoo Backwater Project, PL 116-20, Rocky Bayou Bank Stabilization
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Yazoo City, MS 39194

EWP Streambank Stabilization - 5 Sites - City of Hattiesburg, Forrest County, MS
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Hattiesburg, MS

Rehabilitate Airfield Drainage, Phase 1B Gulfport-Biloxi International Airport
Bidding
$1,500,000 to $1,800,000 est. value
Gulfport, MS 39501

Kings Creek Bank Stabilization
Infrastructure
Bidding
Tupelo, MS 38802

Erosion Repairs at CR 8541
Post-Bid
MS 38829

Drainage Improvements at Tennis Courts/Aquatic Center
Post-Bid
Booneville, MS 38829

Slide Repair
Results
MS

Bank Stabilization on US 84 at the Fair River (Bridge Nos. 74.9A and 74.9B)
Results
MS

Recreation and Units Building Drainage Improvements
Infrastructure
Bidding
Ellisville, MS

East Pinebrook Drive Drainage Improvement
Post-Bid
Brandon, MS

City West 15th Street Pavement and Drainage Improvements
Results
Yazoo City, MS 39194

Outfall No. 31 Box Culvert Connection
Infrastructure
Bidding
MS

Loyd Star Attendance Center Drainage and Grading Improvements
Post-Bid
Wesson, MS 39191

Drainage Improvements for Germantown High School Baseball Field
Infrastructure
Bidding
Madison, MS 39110

Emergency Watershed Protection
Post-Bid
MS

Reported 06/09/2021 12:00 AM
Project Title

Mississippi Department of Marine Resources - Coffee Creek Outfall Replacement

Physical Address View project details and contacts
City, State (County) Biloxi, MS   (Harrison County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This Project is solicited by MDMR to demolish aging infrastructure on the Sand Beach and install an enclosed poured-in-place new double barrel box culvert system to include all necessary dewatering, grading, plantings and amenities to ensure and enhance proper storm drainage from Highway 90 and the surrounding areas into the Mississippi Sound.

Details

Division 02 - Existing Conditions, Demolition.
Division 31 - Earthwork, Grading, Excavation and Fill, Dewatering, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Planting.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents