Similar Projects
Construct New Addition to Transit Administrative Building - City of Battle Creek
Addition, Infrastructure
Conception
$16,400,000 CJ est. value
Battle Creek, MI 49014

South End Development (1901 S. Trumbull St.) - Bay City
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Bay City, MI 48708

Jackson Street Parking Lot Reconstruction - City of Battle Creek
Infrastructure
Design
$1,000,000 CJ est. value
Battle Creek, MI 49037

1121 Electric Avenue Warehouse and Office
New Construction, Infrastructure - 17,774 SF
Design
$3,000,000 CJ est. value
Wayland, MI 49348

DLA- Battle Creek
Infrastructure, Renovation
Bidding
$5,000,000 CJ est. value
Battle Creek, MI 49037

Miscellaneous Concrete/Asphalt Replacement
Infrastructure
Bidding
$200,000 CJ est. value
Bay City, MI 48708

Michigan Sugar Company: Pulp Loading Slab Project
Infrastructure
Post-Bid
Bay City, MI 48706

Underground Storage Tank Removal and Above Ground Tank Install
Infrastructure
Post-Bid
Delton, MI

World-Wide Water Storage Tank Remediation
Term Contract
Results

World-Wide Water Storage Tank Remediation
Term Contract
Results

Cornerstone Alliance - Industrial Park Stormwater Project
New Construction
Construction
Benton Harbor, MI 49022

CBS Concrete Replacement
Infrastructure
Construction
$597,726 CJ est. value
Bay City, MI 48708

Hydro Aluminium Recycling Plant
New Construction, Infrastructure
Pending Verification
$140,000,000 CJ est. value
Cassopolis, MI 49031

North Willowbrook Road Apartments
New Construction, Infrastructure
Pending Verification
$118,000,000 CJ est. value
Coldwater, MI 49036

Woodland Park & Nature Preserve - Planning/Improvement - City of Battle Creek
New Construction, Infrastructure, Term Contract
Conception
$1,980,000 CJ est. value
Battle Creek, MI 49017

Last Updated 09/27/2022 01:45 AM
Project Title

Water System Improvements

Physical Address View project details and contacts
City, State (County) Liberty Township, MI 49201   (Jackson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of improvements to the Townships three well houses including ductile iron piping reconfiguration, installation of magnetic flow meters, chemical injection systems, minor masonry improvements, painting the interior and exteriors, installation of variable frequency drives for each of the four well pumps, and controls and instrumentation reprogramming. Work also includes improvements at the 940,000-gallon ground storage water tank including cable reattachment, installation of new ladder safety climbing equipment, grout repairs and overcoating the tank exterior. The following construction contracts will be awarded separately or together in any combination: Contract No. Identification 1 Mechanical 2 Electrical, Controls & Instrumentation 3 Painting - Water Tank 4 Painting - Wellhouses 5 General Trades Service Purchase Order #1 - Owners Systems Integrator The date that the Bidding Documents are transmitted by the Issuing Office will be considered the Bidder's date of receipt of the Bidding Documents. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. Each proposal greater than $50,000 shall be accompanied by a certified check or Bid Bond by a recognized surety in the amount of 5% of the Bidder's maximum Bid price in the name of Leoni Township. Leoni Township, and F&V Construction Management, Inc., reserve the right to accept any bid, reject any or all bids, to waive informalities and make the award in any manner deemed in the best interest of the Project. Leoni Township, and F&V Construction Management, Inc., reserve the right to accept any bid, reject any or all bids, to waive informalities and make the award in any manner deemed in the best interest of the Project.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents