Similar Projects
SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$610,000 CJ est. value
Martinsville, OH 45146

SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$610,000 CJ est. value
Martinsville, OH 45146

Culvert Replacement - US 250
Infrastructure
Bidding
$75,000 CJ est. value
Wooster, OH 44691

Fredericksburg Communication Tower Project
New Construction, Infrastructure
Bidding
$795,063 CJ est. value
Fredericksburg, OH 44627

Chip and Sealing
Infrastructure
Post-Bid
Wooster, OH

Road Materials Furnished and Applied for 2022
Term Contract, Infrastructure
Post-Bid
Wooster, OH 44691

Hot Mix Leveling
Results
Doylestown, OH

Chip and Seal
Results
Doylestown, OH

Melrose Drive Residential Development
New Construction, Infrastructure
Pending Verification
$31,500,000 CJ est. value
Wooster, OH 44691

Melrose Drive Residential Development
New Construction, Infrastructure
Pending Verification
$31,500,000 CJ est. value
Wooster, OH 44691

South Market Street Mixed Use Building
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Wooster, OH 44691

2023 Wooster Concrete Pavement Replacement
Infrastructure
Bidding
$325,000 CJ est. value
Wooster, OH 44691

Chip and Seal and/or Motor Paving
Infrastructure
Post-Bid
Wooster, OH

West Milltown Road Right Turn Lanes Project
Results
Less than $225,000 est. value
Wooster, OH 44691

Schaeffler Group Addition / Wooster
Addition, Infrastructure - 89,595 SF
Pending Verification
$11,000,000 CJ est. value
Wooster, OH 44691

Last Updated 02/02/2023 05:25 PM
Project Title

Sgt Cleans Car Wash / Wooster

Physical Address View project details and contacts
City, State (County) Wooster, OH 44691   (Wayne County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Car Wash, Gas Station, Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope details have not been released. As of February 2, 2023 the project is in planning stage. The City of Wooster Planning Commission approved a preliminary development plan on January 5, 2023. Information regarding the architect, general contractor and method of selection has not been released. A construction timeline has not been determined, but is not expected to begin before the summer of 2023.

Details

1 Story Above Grade, New Construction, New Construction.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents