Similar Projects
USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Constructing the Safety Improvements (Roadway Lighting Installation) on Sr-8 (Us-80) at the Westrock Paper Mill Entrances
Infrastructure
Results
$612,765 to $748,935 est. value
AL

Constructing the Micro-Milling, Resurfacing Scrub Seal, and Traffic Stripe on SR-10 From 0.290 Mile West of the Junction of SR-69 to the Junction of 3rd Street
Infrastructure
Results
$2,362,413 to $2,887,394 est. value
Sweet Water, AL

Shore Side Detachment Sewage Lift Pump and Pipe Repair
Infrastructure
Post-Bid
$400,000 CJ est. value
Demopolis, AL 36732

Constructing the Safety Widening, Micro-milling, Resurfacing (Scrub Seal), and Traffic Stripe on SR-13 (Us-43) From 0.800 Mile North of the Junction of CR-47
Infrastructure
Results
$1,781,913 to $2,177,893 est. value
AL

A New Baseball Dugout For Demopolis High School For The Demopolis City Board Of Education
Infrastructure
Post-Bid
Demopolis, AL 36732

Constructing the Micro-Milling, Resurfacing (Scrub Seal), and Traffic Stripe on SR-13 (US- 43) from the Junction of 12 Link Road to the junction SR-8 (US-80) in Demopolis
Infrastructure
Results
$1,969,750 to $2,407,472 est. value
AL

Alabama Department of Public Health Southwestern District Facility Improvements
New Construction, Infrastructure, Renovation
Post-Bid
$1,800,000 CJ est. value
Linden, AL 36748

Constructing the Grading, Drainage, Pavement, and Bridge on SR-303 (Linden Bypass) from 1.140 miles south of the junction of SR-13 (US-43) and SR-69 to the Junction of SR-28 in Linden
New Construction, Infrastructure
Results
$49,214,240 to $60,150,737 est. value
AL

2020 CDBG Roadway Improvements
Infrastructure
Post-Bid
$1,131,000 CJ est. value
Linden, AL 36748

Last Updated 01/31/2023 08:45 AM
Project Title

Constructing the Grading, Drainage, Pavement, and Bridge on SR-303 (Linden Bypass)

Physical Address View project details and contacts
City, State (County) Linden, AL 36748   (Marengo County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $83,563,215 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

County : Marengo Constructing the Grading, Drainage, Pavement, and Bridge on SR-303 (Linden Bypass) from the junction of SR-28 to the junction of SR-69 which is 1.500 miles north of the junction of SR-13 (US-43) northeast of Providence. Length 4.690 mi. The Bracket Estimate on this project is from $75,461,968 to $92,231,294 . Contract Time: 550 Working Days If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 028 - Grading, Drainage, Pavement, and Bridge on SR-303 (Linden Bypass) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents