Similar Projects
Lane Sanitary Sewer Line Rehabilitation
Bidding
Less than $30,000 est. value
North Versailles, PA

New 8th Avenue Sanitary Sewer Improvements
Bidding
West Homestead, PA 15120

Penn Hills 2019 CCTV Inspection Contracts - Contract B
Post-Bid
Pittsburgh, PA 15123

Saint Michael Pennsylvania South of Salix Sewer Extension Project - General
Post-Bid
Forest Hills, PA 15221

Shacog Joint Municipal Sanitary Sewer Lining Project
Results
Carnegie, PA

Worcester Drive Sewer Realignment
Results
Carnegie, PA 15106

Moon Golf Club Storage Building - Site Work Construction
Bidding
Moon Township, PA 15108

Ottawa Hills Sewer Rehabilitation Project
Post-Bid
Pittsburgh, PA 15701

2019 Whitehall Borough Sanitary Sewer Excavation
Results
Pittsburgh, PA 15123

2019 Small Diameter Sewer Rehabilitation Contract No. 2 - Brownsville Road Storm Sewer
Bidding
Pittsburgh, PA 15207

Howard Street Sanitary Sewer Inflow Removal Project
Post-Bid
Coraopolis, PA 15108

Shadowlawn Sanitary Sewer HDD Installation
Results
Less than $200,000 est. value
Pittsburgh, PA

2021 CCTV Inspections
Bidding
Pittsburgh, PA

Penn Hills 2020 CCTV Inspection Contracts
Post-Bid
Penn Hills, PA 15235

DPW Building Sanitary and Storm Sewer Relocation
Results
Pittsburgh, PA 15123

Last Updated 05/13/2020 08:54 AM
Project Title

Clay Street Sewer Separation Contract

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA 15215   (Allegheny County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Clay Street Sewer Separation is the construction of a sewer separation project in support of the Ravine Street Stream Removal project. The project is located on Clay Street in Sharpsburg Borough and is bounded on the east by 8th street and on the west by 6th Street. The project includes laying a new 18-inch combined sewer alongside an existing 36-inch brick combined sewer pipe, followed by removing the building service laterals that are entering the 36-inch pipe and connecting them to a newly laid 18-inch pipe. The existing 36-inch pipe will be repurposed to convey PennDOT drainage from 8th street to the large stone pipe on 6th Street. Additionally, the contract will require connection of a short segment of sewer on the south side of street to the newly laid 18-inch sewer pipe across the 60-inch PWSA waterline that occupies Clay Street. There is a lateral from the drive through bank at the corner of 6th Street and Clay Street that will be tied into the sewer line crossing Clay Street. There will be an abandonment of the sanitary sewer pipe that comes from the south side of Clay Street into the stone combined sewer on 6th street. There will be manholes placed on Clay Street to intercept and redirect the sewer lines rerouted to enable the separation of the northerly 36-inch combined sewer that will carry the PennDOT drainage in the future.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents