Similar Projects
Sewer Pipe Lining - 2021
Infrastructure
Bidding
Lancaster, PA

Engleside Combined Sewer Rehabilitation
Post-Bid
Lancaster, PA 17608

2020 I and I Project
Results
Christiana, PA 17509

Sewer Interceptor Relocation
Results
$170,000 est. value
Lititz, PA 17543

Oak Hill Drive Sanitary Sewer Extension Project
Results
$360,000 est. value
Paradise, PA 17562

2020 Sewer Pipe Replacement
Results
Elizabethtown, PA 17022

2020 Sewer Repair
Results
$130,000 to $190,000 est. value
Lititz, PA 17543

Route 322 Low Pressure Sanitary Sewer Manhole Project
Results
Ephrata, PA 17522

North Linden Street Sewer Replacement Project
Results
Manheim, PA 17545

Sadsbury Avenue Metering Manhole Removal and Replacement Project
Results
Christiana, PA 17509

Eden Manor Sewer Interceptor Replacement and Conestoga Pines Trail Improvements
Results
$2,250,000 est. value
Lancaster, PA 17608

Low-Pressure Manhole Project
Results
New Holland, PA 17557

Deer Lane and Fawn Drive Cleaning and Televising Project
Results
Less than $21,000 est. value
Bainbridge, PA 17502

Maple Grove Sewage Pumping Station and Interceptor Expansion - Interceptor Construction
Results
$2,700,000 est. value
Lancaster, PA 17603

Hellers Church Road Water and Sewer Improvements Project
Results
Leola, PA

Last Updated 06/03/2021 11:47 AM
Project Title

Ridge Avenue / Mohler Church Road LPPS Sewer Manhole Project

Physical Address View project details and contacts
City, State (County) Ephrata, PA 17522   (Lancaster County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal and replacement of (1) low-pressure sanitary sewer terminal air release valve / cleanout precast concrete manhole and removal and replacement of one (1) low-pressure sanitary sewer type 2 cleanout precast concrete manhole. The scope of work also includes the removal and replacement of existing 2” and 2.5” PVC low-pressure piping, fittings and valves within eight (8) existing sanitary sewer manholes and the lining of one (1) existing sanitary sewer discharge precast concrete manhole (low-pressure connection to gravity sanitary sewer).

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents