Similar Projects
Aircraft Canopies
Design
Goldsboro, NC 27531

Rockingham Youth Development - Spray Foam
Post-Bid
Reidsville, NC 27230

L.E.C. 1St Floor Ceiling Tile Replacment
Post-Bid
Fayetteville, NC 28302

Insulation Installation and Repair
Term Contract
Results
Raleigh, NC 27610

Insulation Installation and Repair
Term Contract
Results
Raleigh, NC 27610

Remodel BOQ Bldg 496
Post-Bid
$250,000 to $500,000 est. value
Cherry Point, NC 28533

General Construction (FAL)
Term Contract
Results
Raleigh, NC 27610

Aircraft Painting/Restoration Project
Post-Bid
Havelock, NC 28532

Joint Operations Center Video Wall - Joint Force Headquarters
Results
Raleigh, NC 27600

South Campus Building 2000 Exterior Sealant Restoration
Post-Bid
Concord, NC 28027

Plaza Building Wall Repairs
Results
Salisbury, NC 28144

WWTP Install Railings, Stair, and Walkway
Post-Bid
$25,000 to $100,000 est. value
Cherry Point, NC

Repair Building Envelope and Interior Finishes, Building 1016
Results
$10,000,000 to $25,000,000 est. value
Cherry Point, NC 28533

Kitchen Cabinets
Post-Bid
Robersonville, NC 27871

100,000-Gallon Single Pedestal Elevated Water Tank Old Town Hall Demolition
Results
Kenly, NC 27542

Reported 12/02/2021 09:46 AM
Project Title

Air Sealing Repairs at Kings Mountain High School (Package 3)

Physical Address View project details and contacts
City, State (County) Kings Mountain, NC 28086   (Cleveland County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior, Finishes/Interior
Contracting Method Competitive Bids.
Project Status No Responses Submitted, Project to Rebid
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents