Similar Projects
Reported | 06/17/2021 12:00 AM |
Project Title | J045--New HVAC Service Contract |
Physical Address | View project details and contacts |
City, State (County) | Dallas, TX 75216 (Collin, Dallas Counties) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Request for Quotations |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Provide all labor, materials, supervision materials to change filters in 6 HVAC systems located in buildings 24 and 29. This is a 5-year contract with annual and semiannual filter change outs. Building 24 has 3 wings with mechanical rooms named A, B and C wings. A wing mechanical room is located off the loading dock. B and C wings mechanical rooms are on the corresponding wings 3rd floor. Building 29 also has 3 wings named A, B and C. Thisbuilding has a mechanical room centrally located on the second floor of A wing off the loading dock building entrance. Disposal of used filters shall be in VA provided dumpsters located by building 32 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |