Similar Projects
Last Updated | 10/10/2022 11:01 PM |
Project Title | Greene County Tech Softball and Baseball Complex - Remaining Packages |
Physical Address | View project details and contacts |
City, State (County) | Paragould, AR 72450 (Greene County) |
Category(s) | Entertainment/Recreation, Heavy and Highway |
Sub-Category(s) | Athletic Facility, Site Development |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $4,500,000 [brand] Estimate |
Plans Available from | Construction Manager - 09/29/22 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Greene County Tech Baseball & Softball Complex - Remaining Packages Jobsite Address: 4601 Linwood Dr., Paragould, AR 72450 Project No- 1921-2807-006 The Owner reserves the right to reject any or all bids and to waive any formalities. Bidder must have a current general or specialty license from the Arkansas Contractor's License Board before the bid proposal will be considered. The bid proposal and work of the proposed contract shall be in accordance with all applicable federal, state, county and local laws, ordinances, and regulations. Please send all questions to Justin Shrable at Nabholz via email: justin.shrable@nabholz.com or Gary Hoyt at Nabholz via email: gary.hoyt@nabholz.com The Project consists of the construction of new construction of a softball and baseball complex at the Greene County Tech High School Campus and will include fields, dugouts, bleachers, press boxes, restrooms, concessions, storage, and all associated site improvements. Work covered by this section of the specifications shall conform to the contract documents, engineering plans as well as state and local codes. B. The purpose of these specifications is to define the lighting system performance and design standards using an LED Lighting source. The manufacturer / contractor shall supply lighting equipment to meet or exceed the standards set forth in these specifications. C. The sports lighting will be for the following venues: 1. Baseball 2. Softball 3. Security Nabholz Job Number: 07-22-2607 Approximate Construction Finish: March 3, 2023 RFI/Bid Question Process: Bidders shall submit questions in writing (email is preferred) by the established deadline. Questions should reference specific details, plan sheets, specifications, or bid manual sections. RFI/Bid Question Deadline: 2:00 PM on 10/5/2022 1. Provide barricades, excavation protection, traffic control, and flagmen as necessary for this work. 2. Provide all layout and field measurements. 3. Furnish and install all materials necessary for a complete fencing system as shown in the construction documents. This includes decorative & chain link as well as the backstop netting systems. 4. Provide any concrete necessary to complete this work. 5. Furnish all hardware necessary to complete this work. 6. Include all fencing, gates, vinyl coated if required, fabrics, netting, railings, backstops, and other related accessories and materials for a complete installation. 7.Provide & install all aluminum and glass storefront systems, curtainwall systems, and entrances. 8. Provide & install all sills, trims, transoms, cladding, etching, associated exterior caulking, sealants, and adhesives, weather stripping, brake metal, etc. 9. Provide & install all miscellaneous flashings integral with storefront, curtainwall, or entrance systems. 10. Include steel reinforcement within aluminum framing if required. 11.Fabricate, deliver, & install all structural steel columns, beams, tube framing, brace frames, gusset plates, bridging, joists, decking, edge, and other angles, bent plates, connectors, studs, fasteners anchor bolts, loose lintels, wheel guards, railings, rough hardware, bearing and leveling plates, miscellaneous steel trim, shelf and relief angle, tread plate and supports, handrails, and pipe bollards as indicated in the construction documents. |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |