Similar Projects
AutoZone #5818
New Construction - 6,000 SF
Conception
$500,000 to $1,000,000 est. value
Splendora, TX 77372

Home Depot Tool Rental Center
Renovation - 3,100 SF
Design
$350,000 est. value
Porter, TX 77365

Kohl's Sephora #11071
Renovation - 2,500 SF
Design
$300,000 est. value
Conroe, TX 77303

Abercrombie Kids
Renovation - 2,935 SF
Post-Bid
$250,000 est. value
The Woodlands, TX 77380

Caney Mills Phase 3 Clearing and Grubbing
Infrastructure
Post-Bid
TX

Residential Reconstruction Contract
Demolition
Results
Conroe, TX 77301

Westridge Cove Section 2 - Clearing and Grubbing Mass Grading and Detention Improvements
Infrastructure
Results
TX

Magnolia Place Phase I
New Construction - 41,000 SF
Construction
Magnolia, TX 77354

1488 Retail Center
New Construction - 15,000 SF
Construction
Magnolia, TX 77354

Providence at Tamina Road Apartments
New Construction - 95,545 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Shenandoah, TX

Landmark 301 Senior Apartments
Renovation - 51,480 SF
Pending Verification
Conroe, TX 77301

Burlington
Renovation - 25,116 SF
Design
$1,500,000 est. value
Conroe, TX 77303

Clearing And Grubbing In Stonebrooke Sections 1 & 2
Alteration
Post-Bid
$518,960 est. value
TX

Construction of the Mill Creek Estates Clearing and Grubbing Phase III
Infrastructure
Results
TX

Sunglass Hut #5046
Renovation - 1,377 SF
Construction
$200,000 est. value
The Woodlands, TX 77380

Last Updated 12/13/2022 09:31 AM
Project Title

Signorelli Residential Splendora / Montgomery County

Physical Address View project details and contacts
City, State (County) Splendora, TX 77372   (Montgomery County)
Category(s) Commercial, Heavy and Highway, Medical, Residential
Sub-Category(s) Apartments/Condominiums, Medical Office/Outpatient, Office, Park/Playground, Retail, Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $100,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

3,000 acres Master Planned community Phase 1 will be single-family homesites As of December 13, 2022 this project has been updated to Contract award. Although a firm timeline for construction has not been determined, construction is not expected to commence prior to first quarter 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Loading Dock Equipment, Residential Equipment, Residential Appliances, Play Field Equipment and Structures, Playground Equipment, Play Structures, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Rugs and Mats, Office Furniture, Seating, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Distributed Audio-Video Communications Systems, Paging Systems, Healthcare Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Selective Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents