Similar Projects
Funkhouser Building Improvements
Renovation
Conception
$110,000,000 est. value
Lexington, KY 40508

Construct Research Building - University of Kentucky
New Construction
Conception
$265,000,000 est. value
Lexington, KY

College of Design
Renovation - 1,445,000 SF
Design
$38,600,000 est. value
Lexington, KY 40508

New College of Medicine
New Construction - 380,000 SF
Design
$380,000,000 est. value
Lexington, KY 40506

Construct Indoor Track
Infrastructure, Renovation
Bidding
$20,000,000 CJ est. value
Lexington, KY 40508

Robotics Facility Renovation of Rooms 112, 112C, and 009
Renovation
Bidding
$500,000 CJ est. value
Lexington, KY 40508

Renew/Modernize Facilities Frazee Interior Fit-Up - Bid Package #3 Rebid
Renovation
Sub-Bidding
$12,000,000 CJ est. value
Lexington, KY 40508

Greek Housing Delta Gamma BP-02
Renovation
Post-Bid
Lexington, KY 40508

Pavilion A - 5Th Floor Patient Room Fit-Out - BP-04 - Final Cleaning
Build-Out, Alteration
Post-Bid
Lexington, KY

Research Building #2 Phase 4 Design Release 1 - Fit-Out
New Construction, Build-Out - 40,400 SF
Results
$15,517,519 est. value
Lexington, KY

CM Services for Delta Gamma Housing - 2555.0
Renovation, Addition
Results
$6,000,000 est. value
Lexington, KY 40508

College of Comm & Information Studies - University of Kentucky
Addition
Pending Verification
$24,700,000 CJ est. value
Lexington, KY 40508

Psychology Building - University of Kentucky
New Construction
Pending Verification
$39,300,000 CJ est. value
Lexington, KY 40508

Renovate/Improve Nursing Units University of Kentucky Hospital - University of Kentucky
Renovation
Conception
$7,000,000 est. value
Lexington, KY 40506

Gluck Equine Building Lab 448 and 450 Renovation
Renovation
Design
$295,000 CJ est. value
Lexington, KY 40503

Last Updated 12/01/2022 06:07 PM
Project Title

Gatton Business and Economics Renovation - Room# 371

Physical Address View project details and contacts
City, State (County) Lexington, KY 40506   (Fayette County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $151,100 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

This Project Creates 4 New Offices in the Existing Room# 371a Open Office Space Improvements Include New Carpet Flooring, Lay-in Acoustic Tile Ceiling, New Led Lighting and Hvac Improvements - Doors/ Frames Provided by Owner. Construction Date Dec 7, 2022 - Jan 9, 2023. Final award of Contract will be made on the basis of the lowest, responsive and responsible bid which offers the best value. The time for substantial completion for all phases shall be One Hundred Eighty (180) consecutive calendar days and Final Completion shall be Thirty (30) consecutive calendar days thereafter. Substantial Completion will include all site restoration completed, site cleanup and fully functional All bids shall be accompanied by a bid guarantee of not less than five (5%) percent of the amount of the base bid. A 100% Performance Bond and 100% Payment Bond shall be furnished by the successful bidder. All bonding and insurance requirements are contained in the Instruction to Bidders, General Conditions and Special Conditions. No bidder may withdraw his bid for a period of Sixty (60) days after the date set for the opening of bids. Clerical errors and omissions in the computation of the lump sum shall not be cause for withdrawal of the bid without forfeiture of bid bond. Bids may be withdrawn in person only, prior to the closing date for receipt of bids. The University of Kentucky, Construction Procurement Section, reserves the right to reject any and all bids and to waive all formalities and/or technicalities where the best interest of the University may be served.Anyone wishing to discuss specific items is requested to submit the items in writing to Capital Construction Procurement, no later than 09/19/2022 at 1:00 PM Lexington, KY Time. Written questions can be submitted by email to Ken Scott at cckbidquestions@uky.edu or fax to 859.257.1951. Note: Responses to Written Questions received no later than 09/19/2022 will be provided in an addendum issued on or about 09/26/2022.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents