Similar Projects
Comprehensive Infrastructure for Tampa's Neighborhoods - Design-Build
Design
Less than $4,362,009 est. value
Tampa, FL 33602

Gravity Sewer Manhole and Cover, Purchase of
Post-Bid
West Palm Beach, FL 33415

Pipeline Wet Tapping and Line Stop Continuing Construction Contract
Term Contract
Post-Bid
$5,500,000 est. value
West Palm Beach, FL 33416

Construction Manager-at-Risk for Belmonte Road and Pershing Way Water and Sewer Improvements
Results
Less than $200,000 est. value
West Palm Beach, FL

Grand Ridge Sewer Extension Hwy 69
Results
Grand Ridge, FL 32442

RFP for Stillwater Phase 1 Force Main Reuse Upsizing
New Construction
Post-Bid
Saint Augustine, FL

Sanitary Sewer Manhole Inspections and Rehabilitation
Results
Saint Augustine, FL 32085

Thatcher Boulevard Sanitary Sewer Improvements
Post-Bid
Moore Haven, FL 33471

Sewall`s Point Area Septic to Sewer Conversion
Results
Stuart, FL 34996

Gravity Sewer System Condition Assessment and Renewal and Replacement (Inflow/Infiltration - I/I) Excavated Point Repairs
Post-Bid
Hollywood, FL 33022

Lift Station #48 Rehabilitation and Force Main Replacement
Results
Less than $300,000 est. value
Cooper City, FL 33329

Civil Work Related to Taft Street Force Main Condition Assessment
Post-Bid
Hollywood, FL 33022

Gateway RC Club Drainfield Replacement - Encouragement Plan
Results
Jacksonville, FL 32218

Various Sewer Hookups within the City of Moore Haven
Post-Bid
Moore Haven, FL 33471

CDBG Sewer Improvements Phase III
Results
Port Saint Joe, FL

Last Updated 10/14/2021 11:00 AM
Project Title

Fiesta Village Waste Water Treatment Plant Reuse Main Upgrade Phase II

Physical Address View project details and contacts
City, State (County) Fort Myers, FL   (Lee County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor to install approximately 9,330 linear feet of 24-inch PVC open cut reuse main and approximately 4,260 linear feet (horizontal measure) of 30-inch HDPE horizontal direction drill reuse main in a north-south direction from the Fiesta Village Waste Water Treatment Plant to Summerlin Road. The pipeline will be constructed within existing Lee County right-of-way and easements and extend along or across various canals and roadways. Appropriate construction techniques will include open-cut and trenchless construction methods. Trenchless construction will be used to cross all critical crossings.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents