Similar Projects
Parking Enforcement Services for the Division of Motor Vehicle Parking Services
Infrastructure
Bidding
Aurora, IL

Reconstruct the Existing Illinois Prairie Path from Indian Trial Road to the Dupage County Line in Aurora
Infrastructure
Bidding
Aurora, IL

Sidewalk Removal and Replacement Concrete Flatwork
Infrastructure
Post-Bid
West Dundee, IL

2021 Street Resurfacing and Sidewalk Program
Infrastructure
Post-Bid
Batavia, IL

Rotary Plaza Pedestrian Bridge Removal and Walkway Reconstruction
Results
Aurora, IL 60505

2020 MFT Sidewalk Repair Program
Results
Less than $24,876 est. value
Carpentersville, IL 60110

VNA Health Care Parking Area
Alteration
Construction
Aurora, IL 60506

Curb and Gutter Installations, 4" PCC Sidewalk Installations, 6" PCC Sidewalk Installations
Infrastructure
Bidding
Algonquin, IL

2021 Various Parking Lot Rehab
Infrastructure
Post-Bid
Aurora, IL

2020 Alley and Parking Lots Maintenance
Results
Elgin, IL 60120

Orchard Valley Golf Course - Parking Lot Improvements
Renovation
Post-Bid
Aurora, IL 60506

2020 Street Program Wellington Laurel
Renovation
Results
Elgin, IL 60120

2021 Sidewalk Cutting
Alteration
Post-Bid
Aurora, IL

Pavement Improvements
Renovation
Results
Sugar Grove, IL 60554

Downtown Bike Path Rehabilitation
Infrastructure
Post-Bid
Aurora, IL 60506

Last Updated 08/23/2021 03:53 PM
Project Title

2021 Parking Lot Resurfacing - City Hall North and East Fire House

Physical Address View project details and contacts
City, State (County) Batavia, IL   (Kane County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $120,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

• The project is located at 2 City-Owned parking lots in the City of Batavia • This work shall consist of 2 inches of asphalt pavement removal by milling and replacing it with hot-mix asphalt surface course. Pavement markings shall be restored with paint. The total pavement area is approximately 7,000 square yards.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents