Similar Projects
143-Met
New Construction, Infrastructure - 339,070 SF
Design
$93,000,000 CJ est. value
Overland Park, KS 66223

FOLS - Construct two ABA compliant walkways
Infrastructure
Post-Bid
$100,000 CJ est. value
Larned, KS 67550

South Topeka Blvd BNSF Rail Crossing Removal & Pavement Replacement
Infrastructure
Post-Bid
Topeka, KS

City Street Repair
Infrastructure
Results
Topeka, KS

2021 Crack Seal Program
Infrastructure
Results
Overland Park, KS

Treadway Apartments
New Construction, Infrastructure - 505,500 SF
Construction
$200,000,000 CJ est. value
Gardner, KS 66030

State Line 87
New Construction, Infrastructure - 29,500 SF
Construction
$85,000,000 CJ est. value
Leawood, KS 66206

Pizza Hut / Olathe
New Construction, Infrastructure - 1,880 SF
Pending Verification
$570,000 CJ est. value
Olathe, KS 66062

North Restaurant - Lot 12 / Town Center Plaza
New Construction, Infrastructure
Pending Verification
$550,000 CJ est. value
Leawood, KS 66209

Shawnee MedAct Station 1131
New Construction, Infrastructure
Post-Bid
$2,068,000 CJ est. value
Shawnee Mission, KS 66217

Arrowhead Heights Subdivision Street Repair SW 30th Street and SW Hillcrest Road
Infrastructure
Results
Topeka, KS 66630

Chip Seal
Infrastructure
Post-Bid
KS

Street Improvement Project - SE Adams Street from 45th Street to 37th Street
Infrastructure
Results
Topeka, KS 66630

Valvoline Instant Oil Change / Lawrence
Demolition, New Construction, Infrastructure - 2,025 SF
Post-Bid
$1,100,000 CJ est. value
Lawrence, KS 66046

Street Improvement Project
Infrastructure
Results
Topeka, KS 66630

Last Updated 05/13/2023 05:07 AM
Project Title

Replacement of 162nd Road over Grouse Creek and Grouse Creek Overflow

Physical Address View project details and contacts
City, State (County) Winfield, KS 67156   (Cowley County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of 162nd Street over Grouse Creek (FAS 99) and Grouse Creek Overflow (FAS 100). This work includes removing and existing 120'-160'-120' Continuous Deck Truss (FAS 99) and replacing it with a 115'-180'-165' Cont. Composite Welded Plan Girder structure. Additionally, contractor will remove an existing 28'-3@35'-28' Cont. RC Slab structure and replace it with 2-12'x8'x84' RC Rigid Frame Culvert ,

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents