Similar Projects
Wausau - Merrill Constr / Resurface
Infrastructure
Conception
$7,000,000 CJ est. value
Wausau, WI 54401

Camp Phillips Road Town Homes
New Construction, Infrastructure
Design
$45,000,000 CJ est. value
Weston, WI 54476

New Riverlife Apartment Complex
New Construction, Infrastructure
Design
$75,000,000 CJ est. value
Wausau, WI 54401

Veteran's Park Ball Complex
New Construction, Infrastructure
Bidding
Marathon, WI 54448

RFP - Purchase and Develop Village Owned Property at 5500 Schofield Avenue
New Construction, Infrastructure
Bidding
$200,000 CJ est. value
Weston, WI 54476

2019 Riverfront Trash Enclosures
Infrastructure
Post-Bid
$200,000 CJ est. value
Wausau, WI 54403

2019 CDA Housing Concrete Repair Project
Infrastructure
Post-Bid
$300,000 CJ est. value
Wausau, WI 54403

2022 Village of Spencer Gun Range
Infrastructure
Results
$174,876 CJ est. value
Spencer, WI 54479

Thomas Hill Road Lift Station Replacement
Demolition, New Construction, Infrastructure
Results
$282,000 CJ est. value
Edgar, WI 54426

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Old Highway 51 Reconstruction STH 34 - Bird Lane
Infrastructure
Construction
$2,029,144 CJ est. value
Knowlton, WI 54455

South 1st Avenue Apartments
New Construction, Infrastructure
Pending Verification
$18,000,000 CJ est. value
Wausau, WI 54401

The Foundry on 3rd
New Construction, Infrastructure - 141,515 SF
Pending Verification
$44,000,000 CJ est. value
Wausau, WI 54403

V Marathon City, Main Street Const / Resurface
Infrastructure
Design
$500,000 CJ est. value
Marathon, WI 54448

T Bergen, CTH O
Infrastructure
Bidding
$600,000 CJ est. value
Mosinee, WI 54455

Last Updated 01/03/2024 09:35 AM
Project Title

West Wausau Avenue Booster Station Generator

Physical Address View project details and contacts
City, State (County) Wausau, WI 54401   (Marathon County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $223,326 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 11, 2023, the project has been awarded, however, a timeline for construction has not been confirmed. West Wausau Avenue Booster Station Generator In general, the work consists of site improvements, plumbing, and electrical including the following; provide a structural pad for the new generator including excavation, backfill, erosion control and site restoration; remove existing plumbing and instrumentation inside the building related to pressure monitoring, provide new plumbing including connections to existing water main outside the booster station building to allow relocation of existing pressure monitoring instrumentation; install owner provided generator and automatic transfer switch, provide new pump motor, variable frequency drive, associated conduits and conductors, provide programming at the existing SCADA panel as required to monitor new equipment. Please note there will be changes forthcoming in the form of an addendum. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents