Similar Projects
1207 Massachusetts Avenue Mixed-Use
Demolition, New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Arlington, MA 02476

Washington School/ Inland Street Improvements - 2023-12 - City of Lowell
Infrastructure
Conception
$700,000 CJ est. value
Lowell, MA 01851

Kendall Square Redevelopment Commercial Building D
New Construction, Infrastructure - 287,000 SF
Design
$67,000,000 CJ est. value
Cambridge, MA 02142

CityPoint South
New Construction, Infrastructure - 250,000 SF
Design
$76,000,000 CJ est. value
North Waltham, MA 02451

Wastewater Treatment Facility Phase 2 Upgrades - GC Bid
Renovation
Bidding
$15,000,000 CJ est. value
Hudson, MA 01749

Wastewater Treatment Facility Phase 2 Upgrades - SUB Bid
Renovation
Sub-Bidding
$116,000 CJ est. value
Hudson, MA 01749

HVAC Automation and Replacement Deer Island Waste Water Treatment Plant-General
Renovation
Post-Bid
$71,562,000 CJ est. value
Sudbury, MA 01776

727 Massachusetts Avenue Hotel Addition
Addition, Demolition, Renovation, Infrastructure - 51,250 SF
Post-Bid
$20,000,000 CJ est. value
Boston, MA 02203

Pine Grove Cemetery Section Development
Results
$220,000 est. value
Westford, MA 01886

DPW Facility Salt Shed Locus Map Replacement Project
Demolition, New Construction, Infrastructure
Results
$1,543,950 CJ est. value
Melrose, MA 02176

New Compound Semiconductor Lab/Microsystem Integration Facility (CSL/MIF)
Demolition, New Construction, Infrastructure - 160,000 SF
Construction
$276,858,491 CJ est. value
Hanscom AFB, MA 01731

Galen Street Life Sciences Buildings - Phase 1
LEED Certification, New Construction, Infrastructure - 242,000 SF
Construction
$65,000,000 CJ est. value
East Watertown, MA 02472

Central Square Mixed-Use Development
New Construction, Build-out, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Chelmsford, MA 01824

Project Echo
New Construction, Infrastructure - 800,400 SF
Pending Verification
$86,000,000 CJ est. value
Holliston, MA 01746

Arlington Street Mixed Use Building
New Construction, Infrastructure - 14,300 SF
Design
$2,000,000 CJ est. value
East Watertown, MA 02472

Last Updated 10/12/2022 04:03 AM
Project Title

Well 4 WTP Upgrades - Phase 2 - General Bid

Physical Address View project details and contacts
City, State (County) Maynard, MA 01754   (Middlesex County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor Qualification DCAMM Certificate Well 4 Water Treatment Plant Upgrades - Phase 2. Electrical, HVAC, Painting, Roofing/Flashing bids are due days prior to this listed bid date. Contact the GC bidders to confirm when the owner requests these trades.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents