Project Title | Rayford Road and Birnham Woods Drive Intersection Improvements and Rayford Road Improvements Precinct Number 3 |
Physical Address | View project details and contacts |
City, State (County) | Conroe, TX 77301 (Montgomery County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The scope of work for the proposed mobility improvements consists of the items shown on the construction drawings and attached specifications, and are generally described as follows: The project is located on Rayford Road approximately 40 feet east of Waterbend Cove to approximately 400 feet east of Birnham woods drive, including the Birnham Woods Drive intersection, and Birnham Woods Drive approximately 600 feet north of Rayford Road to approximately 600 feet south of Rayford Road. The project length is approximately 5,900 LF. The section of Birnham Woods Drive from approximately 600 feet north of Rayford Road to approximately 600 feet south or Rayford Road will be widened from an existing 2-lane concrete curb and gutter roadway to a 4-lane concrete curb and gutter roadway. The intersection of Birnham Woods Drive and Rayford Road will be expanded to include two through lanes and a dedicated left turn lane at all approaches. The section of Rayford Road from approximately 300 feet west of Birnham Woods Drive to approximately 40 feet east of Waterbend Cove will be widened from an existing 2-lane concrete curb and gutter roadway to a 4-lane concrete curb and gutter roadway. The proposed 8-inch reinforced concrete pavement structure will have 8-inch stabilized subgrade. This project will primarily drain into proposed type “BB” Inlets. The proposed trunk at the Rayford Road and Birnham Woods Drive intersection will receive drainage from proposed type “BB” inlets and connect into the existing trunk on Rayford Road. The concrete section on Birnham Woods Drive will not replace the existing roadway. The existing roadway will be sawcut 12” from the back of curb, and the proposed lanes will dowel into the portion of roadway to remain in place. For the project limits on Rayford Road west of Birnham Woods Drive and east of Waterbend Cove, the new concrete roadway will be built on the south side of the existing road to provide 2 eastbound travel lanes. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |