Similar Projects
John M. Price District Attorney Building - Replace Carpet Throughout Facility - P000176 - Sacramento County
Alteration
Conception
$868,000 est. value
Sacramento, CA 95814

Electrical, Framing, Mechanical, Flooring,Plumbing, Drywall
Alteration
Design
San Francisco, CA 94128

Rebid - Chula Vista Flooring Replacement
Renovation
Sub-Bidding
$80,000 CJ est. value
Chula Vista, CA 91911

CHP Temecula Flooring Replacement
Renovation
Sub-Bidding
$70,000 CJ est. value
Temecula, CA 92590

Flooring Repair at the Medicals Examiners Office
Alteration
Post-Bid
San Jose, CA 95128

Blue Gum Carpet Replacement
Alteration
Post-Bid
Modesto, CA 95358

Scherer Senior Center Improvements
Alteration
Results
Yucaipa, CA 92399

City Hall and CD Annex Carpet Replacement
Alteration
Results
Calimesa, CA 92320

Districtwide Flooring
Renovation
Sub-Bidding
$600,000 CJ est. value
Ontario, CA 91762

California Conservation Corps Tahoe Flooring Replacement for Dorm Rooms
Term Contract
Post-Bid
$165,000 est. value
South Lake Tahoe, CA 96150

Blackbox Stage Floor Replacement Costa Mesa High School
Alteration
Results
Costa Mesa, CA 92626

Floor Covering Repair and Replacement Services
Renovation
Sub-Bidding
$400,000 CJ est. value
Sanger, CA 93657

Assessors Carpet
Alteration
Post-Bid
Hanford, CA 93230

City Hall North Wing Tile Replacement
Alteration
Results
Palm Desert, CA 92260

Flooring Replacement Services at the Chula Vista California Veterans Home
Renovation
Sub-Bidding
$90,000 CJ est. value
Chula Vista, CA 91911

Last Updated 03/30/2023 03:11 AM
Project Title

Carpet Replacement at Multiple School Sites

Physical Address View project details and contacts
City, State (County) Madera, CA 93637   (Madera County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $472,691 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor and its surety shall be liable to the District for any damages arising as a result of the Contractors failure to comply with this obligation, and the Contractor shall not be excused with respect to any failure to so comply by act or omission of the Construction Manager, Architect, Engineer, Inspector, Division of the State Architect, or representative of an of them, unless such act or omission actually prevents the Contractor from fully complying with the Contract Documents and the Contractor protests, in accordance with the Contract Documents that the act or omission is preventing the Contractor from fully complying with the Contract Documents. Such protest shall not be effective unless reduced to writing and filed with the District office within five (5) days of the date of occurrence of the act or omission preventing the Contractor from fully complying with the Contract Documents. The Contractor shall perform all Work within the time stipulated the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5 below for the following Project: Refer questions to Susan Harautuneian via email @ susanharautuneian@maderausd.org no later than February 24, 2023 @ 10:00 am. Only questions received via email will be responded to. Bidders shall be required to have a valid class "B" and/or "C-15" Contractor's License.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents