Similar Projects
ADA Surveys / Improvements, Boise State University
Infrastructure
Bidding
$450,000 est. value
Boise, ID 83725

Kings Road and Victory Road Roundabout
Infrastructure
Bidding
$300,000 est. value
Nampa, ID 83687

Main Street Sidewalk ADA Ramps
Alteration
Post-Bid
Lapwai, ID

Parking Lot and Utilities Demolition
Infrastructure
Post-Bid
Coeur d'Alene, ID 83814

Idaho Community Development Block Grant
New Construction, Infrastructure
Results
$175,174 est. value
Moscow, ID 83843

Pedestrian Path Connection Plan
Infrastructure
Results
$250,000 to $500,000 est. value
ID

Replacement of Concrete
Infrastructure
Post-Bid
Harrison, ID

Adding Bicycle Land Updating Sidewalks
Infrastructure
Results
$10,000,000 to $15,000,000 est. value
Bonners Ferry, ID

2022 Waterline Surface Repair
Infrastructure
Post-Bid
Idaho Falls, ID

Sixth Street Pedestrian Improvements
Infrastructure
Results
$1,000,000 to $2,500,000 est. value
ID

Creason Pathway Construction
Infrastructure
Post-Bid
Meridian, ID

Christine St, Northview St To Ustick Road
Alteration
Results
$1,100,000 est. value
ID

Parking Lot Improvements, Maggie Creek
Infrastructure
Post-Bid
$434,640 est. value
Kamiah, ID 83536

Hawkins Loop Trail Build
Infrastructure
Results
ID

Sidewalk Local Improvement District
Infrastructure
Post-Bid
Nampa, ID

Reported 05/14/2022 12:00 AM
Project Title

Rectangular Rapid Flash Beacon (RRFB) for Barrister Drive Pedestrian Crossing

Physical Address View project details and contacts
City, State (County) Boise, ID 83704   (Ada County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $20,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work to be included in the Construction Contract is generally described assite preparation and installation of a Rectangular Rapid Flash Beacon (RRFB), with equipment provided by the Ada County Highway District (ACHD), at a crosswalk located on Barrister Drive on the Ada County Public Safety Building Campus. The existing crosswalk connects the Community Transition Center, formerly the Work Release Center, located at 7255 W. Barrister Drive to the main Public Safety Building property located at 7200 W. Barrister Drive, in Boise, Idaho, as further described in the Project Manual. Please see Exhibit C. Work is to be coordinated with Ada County Operations and Ada County Sheriff's Office personnel.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents