Similar Projects
New Pump Station
New Construction
Conception
$974,500 est. value
Waterloo, WI

2022 Water System Improvements - Contract B
New Construction, Infrastructure
Bidding
$2,400,000 est. value
Cross Plains, WI

Solid Waste Station And Recycling Transfer Station Hauling
Renovation
Bidding
WI

Pumping Station 4 Rehabilitation
Post-Bid
Madison, WI

Big Buck Lift Station Improvements Phase I
Post-Bid
Kenosha, WI 53142

Sanitary Sewer Pump Station - Frame Park Restroom
Results
Waukesha, WI 53188

Mannville Lift Station Replacement
Renovation
Results
Marshfield, WI 54449

Lift Station Grating Replacement
Renovation
Bidding
Delavan, WI

Lift Stations 1 & 10 Generator Buildings
Renovation
Post-Bid
$345,000 est. value
Pewaukee, WI 53072

Lift Station No. 3 Improvements
New Construction
Results
$625,000 est. value
Wind Lake, WI 53185

South Street Lift Station Upgrade
Renovation
Bidding
Poynette, WI 53955

SMU Lift Station Replacement
Post-Bid
New Franken, WI

Tiedeman Pond Lift Station Upgrades
Results
$600,000 est. value
Middleton, WI

Pump Station 17 Rehabilitation and Force Main Relief Phase 2
Renovation, Infrastructure
Post-Bid
Verona, WI

Museum Place Storm Lift Station
Results
Green Bay, WI

Reported 02/18/2022 12:00 AM
Project Title

Jefferson Street Storm Lift Station

Physical Address View project details and contacts
City, State (County) Portage, WI 53901   (Columbia County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $50,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of new submersible pump and pump components in existing wet well, pavement removal, construction of new 8” force main, abandonment of existing 2” force main, and connection of pump to existing control panel, pavement installation, and site restoration. There is an alternate bid for all work in base bid plus replacement of existing wet well and installation of a new, 12’ deep structure

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents