Similar Projects
Will E. Seay Window Replacement and HVAC Upgrades 4314 Bishop Lane
Renovation
Sub-Bidding
$500,000 CJ est. value
Louisville, KY 40216

HZLD Replace Walk-ins/Freezers
Renovation
Sub-Bidding
$429,975 CJ est. value
Louisville, KY 40215

Walk-In Cooler Freezer Units and Installation
Alteration
Post-Bid
Louisville, KY 40213

Split System and Rooftop A/C Replacement
Alteration
Post-Bid
Louisville, KY 40212

HSC 55C - IAQ Upgrades - Install Fan Filter Units and Ductwork Modifications
Alteration
Results
Louisville, KY

Restore AHU-10 System or S 5-7
Term Contract
Results
$500,000 to $1,000,000 est. value
Louisville, KY 40206

HVAC and Mechanical Services
Term Contract
Post-Bid
Louisville, KY

HSC 55C - IAQ Upgrades - Air Damper and Air Flow Measuring Stations
Alteration
Results
Louisville, KY

HVAC Water Treatment Services
Term Contract
Post-Bid
Louisville, KY

Bingham Gardens HVAC Upgrades
Alteration
Results
$150,750 est. value
Louisville, KY 40216

HVAC Renovation at TARC Union Station Bus Storage Facility
Alteration
Post-Bid
$300,000 est. value
Louisville, KY 40203

HVAC Services
Alteration
Results
Louisville, KY

Air-Handling Unit Replacement
Alteration
Post-Bid
$200,000 est. value
Louisville, KY 40209

Western MS HVAC Phase 1
Alteration
Results
Louisville, KY 40212

Hood Cleaning
Alteration
Post-Bid
Louisville, KY

Last Updated 03/28/2023 04:59 PM
Project Title

Boiler Replacement Price Elementary School

Physical Address View project details and contacts
City, State (County) Louisville, KY 40218   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $482,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of two phases of work. The first phase will include the removal of two hot water boilers, circulating pumps, and associated piping, and the installation of two new gas-fired condensing-type boilers, boiler circulating pumps, and interconnecting piping. Automatic changeover valves will also be installed and wired by a controls contractor to replace manual changeover valves. A new exit door from the boiler room will also be added during phase 1 and the gas piping will be reworked to split the generator onto its own meter. The second phase will include the removal of the existing air-cooled chiller, chilled-water pump, and associated piping, and the installation of a new split chiller with two air-cooled condensers and associated piping. Phase 2 will be completed after the building has been changed over to heating in the winter. The Controls Contractor will be responsible for programming the controls for the new chiller. Electrical work includes power supply for the boilers and boiler pumps, chiller and condensers, emergency boiler shut-off, and emergency egress lighting for new boiler room exit door. No bids received after this time will be considered No mailed in or faxed bids will be accepted. Bidder needs to be present at the bid opening or the bid shall be automatically rejected. Single or multiple contracts shall be awarded on the basis of the lowest and best lump sum bid, or on the lowest and best combination of individual bids, whichever is deemed to be in the best interest of the Jefferson County Public Schools. In addition to lowest and best bid, a minimum number of points may be required to be awarded for the General Contractor's Good Faith Efforts if District's goals are not met. (See Good Faith Effort Scoring System in M/W/VBE Program requirements) Bid Guaranty in the form of a Certified/Cashier's Check or Bid Bond shall accompany each bid. The amount of the Bid Guaranty shall not be less than five percent (5%) of the bid set forth on the Form of Proposal. The Bid Guaranty shall be made payable to Jefferson County Public Schools. The Bid Guaranty shall be issued by a Surety Company that has an A.M. Best Company rating of "A-" or better. Refer to Supplemental Instructions to Bidders. Absence of this document will be grounds for automatic rejection of bids. Certified or cashier's checks will not be returned until Board approval of the successful bidder. Bids may not be withdrawn for a period of 45 days after the designated time for receipt of bids. Contractor's Profile form, if not currently on file, is due prior to award of a contract. The Jefferson County Board of Education provides equal opportunities to all of its bidders with respect to the bidding and award of construction contracts. Jefferson County Public Schools requires that the bidder submit to the Facility Planning Unit, with the bid, the following information: 1. Proposal Form-properly signed, with completed unit prices and listing of all sub-contractors at time of submittal. A listing of manufacturers shall be submitted within 1 hour following the bid. 2. Bid Security-properly signed, witnessed and executed. 3. Minority, Women, and Veteran Business Enterprise Sub-contracting Plan; Contractor's Good Faith Effort Summary Sheet, Affidavit, and Supplemental Sheet--properly completed, signed, and dated. The Owner reserves the right to accept any bid, reject any or all bids, to waive any informalities in bids received where such acceptance, rejection or waiver is considered to be in the best interest of the Owner, and to reject any bid where evidence or information submitted by the bidder does not satisfy the Owner that the bidder is qualified to carry out the details of the contract documents. Refer to spec section "JCPS Amendment to the General Conditions of the Contract for Construction" for requirements for 100% performance and payment bonds.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents