Similar Projects
Theatre Concrete Polishing and Terrazzo Installation
Post-Bid
Des Plaines, IL 60016

Highland Flooring Replacement
Post-Bid
Downers Grove, IL 60515

Amp 2 Kitchen, Bathroom, And Flooring Upgrades
Renovation
Results
Springfield, IL 62702

DNR Des Plaines State Fish and Wildlife Area Concrete Floor Slab
Results
Wilmington, IL 60481

Classroom Flooring at McCracken MS & Middleton ES
Post-Bid
Skokie, IL 60076

Basement Seepage Remediation
Results
Less than $600,000 est. value
Saint Charles, IL 60175

Village Hall Carpeting Installation
Post-Bid
Volo, IL 60073

Carpeting and Painting
Results
Peoria, IL 61602

Restroom Resinous Flooring Replacement
Post-Bid
Romeoville, IL 60446

B Building Finish Replacements
Renovation
Results
Less than $102,750 est. value
Carterville, IL 62918

McHenry County Jail Shower Epoxy Finish Replacement Services
Post-Bid
Woodstock, IL 60098

Centennial East Scene Shop Flooring
Renovation
Results
Normal, IL 61790

Don Preston Gym Replacement Floor
Post-Bid
$200,000 est. value
Midlothian, IL 60445

Kitchen Floor Tile Replacement at Ogden Elementary School
Results
Chicago, IL 60610

Hardwood Synthetic Sports Flooring
Post-Bid

Last Updated 06/30/2021 12:27 PM
Project Title

Interior Renovations/Upgrades, Phase 3

Physical Address View project details and contacts
City, State (County) Harrisburg, IL   (Saline County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior, Flooring
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $615,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remodel 8 units in 2 buildings including abatement of floor tile and mastic. Remove and replace under slab sewerlines. Install new hi-efficient HVAC systems including ductwork (insulated). Install new (pex) domestic waterlines, including shut-off valves (insulate new lines). Install new gypsum board on all partitions and ceilings. Insulate all exterior walls with spray foam insulation. Insulate attic with blown-in insulation (R-49). Install eave baffles at every truss space. Remove and replace all bathroom fixtures and accessories. Remove existing kitchen cabinets, sink, and faucet. Reconfigure kitchen where possible for better lay-out and install new sink, faucet, cabinets, and countertops. Remove and replace existing electrical wiring, switches, receptacles, and light fixtures. Remove and replace entrance doors and storm/screen doors. New entrance doors shall have wood frames and hollow metal insulated slabs. Install new flooring and base throughout units. Have termite treatment performed on entire exterior of buildings.

Details

Division 02 - Existing Conditions.
Division 03 - Concrete.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes, Flooring.
Division 10 - Specialties.
Division 11 - Equipment.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents