Similar Projects
Upper Harbor Terminal Park Masterplan
New Construction, Infrastructure
Conception
$5,000,000 est. value
Minneapolis, MN

Grading and Bituminous and Concrete Pavement Repair
Infrastructure, Alteration
Conception
$6,600,000 est. value
Osseo, MN 55369

Street and Utility Improvement Project
Infrastructure
Design
$5,280,418 CJ est. value
Medicine Lake, MN 55441

Street and Utility Improvement Project
Infrastructure
Design
$5,280,418 CJ est. value
Medicine Lake, MN 55441

McCauley Trail 2022 Improvements
Infrastructure
Bidding
$372,420 CJ est. value
Edina, MN 55439

Currie Commons
New Construction, Infrastructure
Post-Bid
$75,000,000 CJ est. value
Minneapolis, MN 55405

Energy Hills, Woodland Ponds, Wintergreen Area Street Reconstruction
Post-Bid
Maple Grove, MN

2021 Infrastructure Improvements
Results
$1,500,000 to $2,000,000 est. value
MN

Site Improvements at Stewart Park
Results
Minneapolis, MN 55407

Quarter Lake West Apartments Phase I
New Construction
Construction
$224,000,000 est. value
Minneapolis, MN 55416

County Road 47 Reconstruction Phase 1
Infrastructure
Construction
$5,909,352 CJ est. value
Plymouth, MN 55446

MPHA Family Housing Expansion / Site 11 - Minneapolis Public Housing Authority
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Minneapolis, MN 55411

MPHA Family Housing Expansion / Site 13 - Minneapolis Public Housing Authority
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Minneapolis, MN 55417

Intersection Modification, ADA Improvement and Drainage Repair
Infrastructure
Conception
$1,300,000 est. value
Minneapolis, MN 55403

Crystal Community Center Parking Lot and Bassett Creek Dog Park
Infrastructure
Design
$2,079,215 CJ est. value
Crystal, MN 55422

Last Updated 09/07/2022 09:35 AM
Project Title

Sanitary Trunk Capacity Exp Grandview Lift Station - 19-337 - City of Edina

Physical Address View project details and contacts
City, State (County) Minneapolis, MN 55436   (Hennepin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected August 2021
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will meet increasing sewer capacity needs in a part of the Grandview Area by updating a lift station. The project follows the construction of a new apartment building on Eden Avenue and planning for new capacity needs identified as part of the Grandview Area small area plan. Environmental Considerations: Carbon: Lift station upgrades allows us to consider energy efficient pumps and controls to reduce the environmental impact. Surface water: Site modifications may be considered to reduce impervious surfaces with low impact development techniques. Green Alternatives: Alternative construction methods may be utilized tp reduce greenhouse gases associated with equipment installations or operations, and hydro-seeding restoration versus traditional sod placement when feasible. As of July 28, 2021 this project is in pre construction. The general contractor has been identified. Construction is anticipated to begin in August of 2021 and end in October 2022. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents