Similar Projects
STH 146 - STH 73 - Const Ops/ Bridge Reconstruction
Demolition, New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Poynette, WI 53955

STH 146 - STH 73 - Const Ops/ Bridge Reconstruction
Demolition, New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Poynette, WI 53955

Lodi - Baraboo Const / Mill and Overlay
Infrastructure
Design
$3,000,000 CJ est. value
Lodi, WI 53555

Lodi - Baraboo Const / Mill and Overlay
Infrastructure
Design
$3,000,000 CJ est. value
Lodi, WI 53555

Town of Columbus, Old STH 73 Rd
Demolition, New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Columbus, WI 53925

Town of Columbus, Old STH 73 Rd
Demolition, New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Columbus, WI 53925

Columbia County Road Improvements
Renovation
Post-Bid
Columbus, WI

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Geogrid Asphalt Pavement Design Alternatives
Results
Portage, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

The View Porte Cochere and Cold Storage Ramp Addition
Addition, Demolition, Infrastructure
Pending Verification
$300,000 CJ est. value
Wisconsin Dells, WI 53965

Town of Scott, Inglehart Road - Construct Ops/ Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Cambria, WI 53923

Business Park Road Manufacturing Development / Wisconsin Dells
Addition, Demolition, Infrastructure - 9,600 SF
Design
$1,036,800 CJ est. value
Wisconsin Dells, WI 53965

Last Updated 01/26/2023 11:07 AM
Project Title

Doug Hare Way Extension

Physical Address View project details and contacts
City, State (County) Pardeeville, WI 53954   (Columbia County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $333,128 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 25, 2023, construction started in 2022 but is currently on hold for the Winter. Construction is expected to resume in Spring, 2023. The work for which bids are asked includes the following approximate quantities: 420 LF of sanitary sewer (8-inch diameter) and laterals along with associated sanitary sewer work; 480 LF of water main (6-inch thru 10-inch diameter) and services; 140 LF of storm sewer (12-inch thru 24-inch diameter) and associated storm structure work; 2,200 SY aggregate base installation; 1,900 SY of asphalt pavement; 4,200 SF of concrete sidewalk; 850 LF concrete curb and gutter; as well as all related work including surface restoration, unclassified excavation, erosion control, traffic control and related miscellaneous construction. Direct all bidding inquiries to Project Manager, Sara Sharpe, at (920) 392-5147. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. BIDDER is required to deliver the original certified check or bid bond within the 72 hours of bid opening to MSA Professional Services, Inc., Attn: Jason Laue, 201 Corporate Drive, Beaver Dam, WI 53916. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdrawn within 60 days after the actual date of the opening thereof. Pursuant to Section 66.0903, Wisconsin Statutes, the minimum wages to be paid on the project shall be in accordance with the wage rate scale established by Local wage rates. OWNER reserves the right to waive any informalities or to reject any or all bids. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents