Similar Projects
Bear Exhibit Redevelopment Project - Bid Package #2
Term Contract
Bidding
Toledo, OH 43609

Production Well PW-12 Refurbishment
Infrastructure
Bidding
$246,000 est. value
OH

State Routes 7 and 148 Water Main Replacements
Post-Bid
Less than $125,000 est. value
Powhatan Point, OH 43942

PUB Water Treatment Plant Well Rehabilitation Project
Post-Bid
$597,200 est. value
Batavia, OH 45103

Glyco II Forcemain Replacement - Contract A
Results
$1,639,924 est. value
Painesville, OH

Ductile Iron and Pipe Fittings Price Agreement
Term Contract
Results
Kettering, OH

Central Avenue - Verity Parkway to Charles Street
Infrastructure
Bidding
Middletown, OH 45044

Waterline Replacement
Post-Bid
Less than $138,700 est. value
Syracuse, OH 45779

Vitrified Clay and PVC Pipe
Results
Cleveland, OH 44114

Water and Wastewater Step Pump and Filtered Pump Vault Purchase
Infrastructure
Bidding
OH

Water Main Renewal Phase 2
Post-Bid
Cleveland, OH

Ductile Iron Pipe and Fittings
Results
Cleveland, OH 44114

South 4th Street Area Waterline Improvements
Infrastructure
Bidding
$1,860,000 est. value
South Point, OH

Water Meters 2021
Term Contract
Post-Bid
Lorain, OH

Automatic Read Water Meters
Results
Mantua, OH 44255

Last Updated 11/23/2021 10:22 AM
Project Title

Water Line to Well Nos. 8 and 9, Division B, 2021

Physical Address View project details and contacts
City, State (County) Defiance, OH   (Defiance County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,550,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of construction of a new 8-inch water lines to Well Nos. 8 & 9 by open cut, directionally drilled, and bored methods. Work shall include underground water line, valve vaults, piping, electrical power, VFD’s, natural gas generator, and gas line. The project includes electrical modifications at the WTP and new telemetry system.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents