Similar Projects
Primrose School / Madison
New Construction, Infrastructure - 13,685 SF
Design
$3,000,000 CJ est. value
Madison, AL 35756

Summerfields at the Gamble House / Athens
New Construction, Infrastructure
Design
$125,000,000 CJ est. value
Athens, AL 35671

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Bowers Road Water Main Improvements
Infrastructure
Post-Bid
Madison, AL 35756

Sidewalk and Pedestrian Bridge on Elm Street (SR-99) between Garrett Drive and US-31 (SR-3)
Infrastructure
Post-Bid
$875,000 to $975,000 est. value
Athens, AL 35611

Water Main Relocation - Browns Ferry Road I-65 to US Highway 31
Results
$2,000,000 to $2,400,000 est. value
AL

Browns Ferry Road Water Main Relocation East
Infrastructure
Results
$3,500,000 to $4,000,000 est. value
Athens, AL

Houston Place Subdivision - Addition 6
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Athens, AL 35671

Athenian Sky Solar Farm
Infrastructure
Pending Verification
$85,000,000 CJ est. value
Athens, AL 35611

Tidal Wave Auto Spa / Athens
New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Athens, AL 35611

Parking Lot Sweeping Services
Infrastructure
Post-Bid
Huntsville, AL

Elm Street (SR-99) and Wilkinson Street Intersection Improvement
Infrastructure
Results
$600,000 to $700,000 est. value
Athens, AL 35611

KC Logistics Trucking / Athens
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Athens, AL 35611

Browns Crossing West Subdivision Phase 2B / Athens
New Construction, Infrastructure
Design
$14,869,552 CJ est. value
Athens, AL 35613

Last Updated 02/27/2023 04:22 PM
Project Title

Welcome Center Replacement (Site Construction/Grading, Drainage, Pavement, Lighting, and Structures) on I-65

Physical Address View project details and contacts
City, State (County) Athens, AL 35613   (Limestone County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $7,963,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of October 13, 2022, bids were rejected. No definite date for the rebid.** County : Limestone Constructing the Welcome Center Replacement (Site Construction/Grading, Drainage, Pavement, Lighting, and Structures) on I-65 north of Athens. Length 0.839 mi. The Bracket Estimate on this project is from $5,539,712 to $6,770,759 . If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 014 - Welcome Center Replacement (Site Construction/Grading, Drainage, Pavement, Lighting, and Structures) on I-65 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents