Similar Projects
Last Updated | 07/26/2022 10:07 AM |
Project Title | Glebe Harbor-Cabin Point Sanitary District Cabin Point Beach Nourishment Project |
Physical Address | View project details and contacts |
City, State (County) | Montross, VA 22520 (Westmoreland County) |
Category(s) | Heavy and Highway, Single Trades |
Sub-Category(s) | Dock/Pier/Marine, Plumbing, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $325,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Sealed Bids for work associated with the installation of nine (9) stone breakwaters, to create approximately 1,904 linear feet of a gapped breakwater system, which will be backfilled with 10,520 cubic yards of clean sand fill (90% sand). The breakwaters will have a maximum crest height of 4 feet above the mean high-water elevation (NAVD88), a maximum base width of 33 feet, and aligned at the terminus of the existing timber groins. Additional work includes the placement of 66 linear feet of riprap against the side of Groin # 9 and the installation of a 91 linear feet of riprap jetty extension. Perform all necessary cleaning and disposal operations to the satisfaction of the County. Bids received after this time will not be accepted. Bids may be withdrawn in accordance with applicable provisions of the Code of Virginia. All proposals shall be submitted in accordance with the Instructions to Bidders, Paragraph 7 - Bid Submission - to be found in these specifications. Each Bidder is required to submit an experience and equipment list with their bid. Westmoreland County hereby reserves the right, which is understood and agreed to by all Bidders, to refuse any or all bids submitted; and also reserves the right to waive any informality in bids received, but any contract awarded will be to the lowest responsive and responsible bidder. No Bidder may withdraw his bid within sixty (60) calendar days after the actual date of the bid opening. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |