Similar Projects
Cargo Dock 9 Stormwater and Wastewater Improvements & Cargo Dock 9 Pavement Improvements
Bidding
Corpus Christi, TX

Phase 1B Detention to Serve Chambers Creek
Bidding
TX

Storm Sewer, Sanitary Sewer and Water Lines to serve Morton Creek Ranch Section 15
Post-Bid
TX

Water, Sanitary Sewer, Storm Sewer Extensions, and Paving Improvements Serving 42.67 Acre Trac
Post-Bid
TX

Construction of Water Distribution, Wastewater Collection and Storm Water Facilities to Serve Fosters Ridge, Section Sixteen and Fosters Ridge, Section Seventeen
Results
TX

Bonterra at Cross Creek Ranch, Section Eight Water, Sanitary Sewer, and Storm Sewer Facilities
Results
TX

Water Distribution, Wastewater Collection, Storm Water Facilities and Paving to serve Cane Island, Section Ten
Bidding
TX

Rehabilitation of Outfall 32
Post-Bid
Hunters Creek Village, TX 77024

Storm Sewer Trunk and Detention Basin
Results
Less than $1,201,404 est. value
New Caney, TX

Water Distribution, Wastewater Collection, Storm Water Facilities and Paving to serve Meridiana, Section Forty Nine
Bidding
TX

Storm Water Pump Repair – Houston District
Post-Bid
Houston, TX 77007

Water Distribution, Wastewater Collection, Storm Water Facilities and Paving to Serve Madison Bend, Section Two
Results
TX

Water Plant Storm Outfall Rehabilitation H.C.F.C.D. Unit P149-00-00
Bidding
TX

Schwertner Ranch Phase 2 Sanitary Sewer, Water, Storm Sewer, Drainage and Road
Post-Bid
TX

Proposed Phase One Excavation and Fill Placement to Serve Highland Meadows Detention
Results
Less than $1,081,343 est. value
TX

Last Updated 04/15/2021 02:58 AM
Project Title

Boggy Creek-MLK TOD Stormwater Conveyance Improvements Phase 1

Physical Address View project details and contacts
City, State (County) Austin, TX 73301   (Travis County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Improvements include new stormdrain infrastructure on MLK Jr. Boulevard near the Capital Metro Red Line.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents