Similar Projects
Reported | 01/24/2019 12:00 AM |
Project Title | Rigging and Maintenance |
Physical Address | View project details and contacts |
City, State (County) | Pittsburgh, PA (Allegheny County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Contractor must make available the following equipment in good working order along with properly trained, competent, equipment operators. The following equipment will be required of the contractor Under-bridge inspection crane (snooper) with 40' minimum horizontal reach, driver and operator. Manlift (JLG) with operator, maximum rated vertical reach to be between 50' and 60'. Bucket truck with operator, maximum rated vertical reach to be 35'. - Boat with off-board motor suitable to perform underwater probing inspections. - Rigging setup for free-climbing. Provide a Tool (equipment) Truck with generators, extension ladders etc. for structural access operations. Shadow vehicle per PennDOT Publication 213, as required. Traffic control including, but not limited to: warning signs, flags, cones, paddle boards, two-way radios and flaggers (per PennDOT Publication 213, as required). | ||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |