Similar Projects
PS1 24" Forcemain - Construction - 22A01 - North Shore Water Reclamation District
Infrastructure
Conception
$5,368,000 CJ est. value
Gurnee, IL 60031

Storm - Clavey - US 41 to Green Bay - City of Highland Park
Infrastructure
Conception
$2,303,000 CJ est. value
Highland Park, IL 60035

Blackburn Street Multi-Residential Renovation
Addition, Demolition, Infrastructure
Design
$600,000 CJ est. value
Gurnee, IL 60031

Blackburn Street Multi-Residential Renovation
Addition, Demolition, Infrastructure
Design
$600,000 CJ est. value
Gurnee, IL 60031

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Drainage Improvements
Infrastructure
Post-Bid
$300,000 CJ est. value
Waukegan, IL 60085

Holiday Hills/ Le Villa Vaupell Sewer Extension - Phase 1
Infrastructure
Results
$6,227,127 CJ est. value
Island Lake, IL 60042

Site Improvements
Infrastructure
Results
Vernon Hills, IL 60061

The Clove
New Construction, Infrastructure - 113,000 SF
Construction
$150,000,000 CJ est. value
Buffalo Grove, IL 60089

Peterson Road Mixed Use
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Libertyville, IL 60048

U-Haul / Mundelein
New Construction, Infrastructure - 33,800 SF
Pending Verification
$3,500,000 CJ est. value
Mundelein, IL 60060

Streets - Clavey - US 41 to Green Bay - City of Highland Park
Infrastructure
Conception
$1,620 CJ est. value
Highland Park, IL 60035

Grand Avenue Car Wash Redevelopment
Addition, Demolition, Renovation, Infrastructure
Design
$1,000,000 CJ est. value
Gurnee, IL 60031

Elgin O'hare Western Access Tollway (I-490) Railroad Bridge Construction, Union Pacific Railroad Over Grand Avenue East of Tri-State Tollway (I-294)
New Construction, Infrastructure
Post-Bid
$20,812,779 CJ est. value
Gurnee, IL 60031

Special Service Area No. 13 Watermain Extension
New Construction, Renovation
Results
Green Oaks, IL 60048

Last Updated 12/15/2023 12:18 PM
Project Title

Pavement Rehabilitation Program - Village of Lincolnshire

Physical Address View project details and contacts
City, State (County) Lincolnshire, IL 60069   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Request for Qualifications, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 15, 2023, per owner, an engineer has been identified. This was for engineering only and is a multi-year contract. Construction is bid out separately. The Village of Lincolnshire hereby solicits qualified and interested firms to submit statements of qualifications for the purpose of contracting with a qualified engineering firm to assist the Village of Lincolnshire in bid documents and construction management for its annual pavement rehabilitation program. It is the intent to solicit interest from those firms that are prequalified by the Illinois Department of Transportation to perform this type of work. The Village of Lincolnshire annually rehabilitates approximately 1-2 miles of subdivision streets in addition to the resurfacing of bike paths and parking lots for its parks. The successful consultant will prepare bid specifications for roadways, paths and parking lots determined by Village staff. Typically, this work will involve resurfacing, spot repairs to curb and gutters and drainage structures. Patching will be identified in the field using assumed quantities. The villages utilize a combination of Motor Fuel Tax funds and general funds to fund the construction work only. Engineering fees will be funded with local funds only. Questions due via e-mail to Wally Dittrich at wdittrich@lincolnshireil.gov by January 31, 2022, on 3:00 PM February 1, 2022, Question answers to be posted to Village website. February 16 - February 23, 2022: Staff review of qualifications. February 23 - March 4, 2022: Notification/negotiations with preferred consultant March 29, 2022, Anticipated Notice to Proceed The method of Contractor Selection has not been Determined at this time.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents