Similar Projects
145th Street East Warehouse and Distribution Development
New Construction, Infrastructure - 830,000 SF
Conception
$89,600,000 CJ est. value
Rosemount, MN 55068

145th Street East Warehouse and Distribution Development
New Construction, Infrastructure - 830,000 SF
Conception
$89,600,000 CJ est. value
Rosemount, MN 55068

Suite Living of Rosemount
New Construction, Infrastructure
Design
$10,300,000 CJ est. value
Rosemount, MN 55068

Aldi #74 / Farmington
New Construction, Infrastructure - 22,245 SF
Design
$3,200,000 CJ est. value
Farmington, MN 55024

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

2022 District Wide Pavement Rehabilitation - Parking Lot Improvements
Infrastructure
Post-Bid
$3,500,000 est. value
Mendota Heights, West Saint Paul, MN 55118

Grading, Bituminous Surfacing, Signing, TMS, and Lighting
Results

2021 Crack Sealing and Seal Coating
Results
MN

Biscayne Avenue Winery
New Construction, Infrastructure - 8,000 SF
Construction
$4,300,000 CJ est. value
Rosemount, MN 55068

Biscayne Avenue Winery
New Construction, Infrastructure - 8,000 SF
Construction
$4,300,000 CJ est. value
Rosemount, MN 55068

Vermillion Acres Senior Housing
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Hastings, MN 55033

Amber Fields
New Construction, Infrastructure
Pending Verification
$740,500,000 CJ est. value
Rosemount, MN 55068

Roundabout at CSAH 11 at Burnsville Parkway in Burnsville - 11-27 - Dakota County
Infrastructure
Conception
$2,100,000 CJ est. value
Burnsville, MN 55337

147th and Glazier Intersection Improvements - City of Apple Valley
Infrastructure
Design
$2,600,000 CJ est. value
Apple Valley, MN 55124

Facility Parking Lot Mill And Overlay
Infrastructure
Post-Bid
$300,000 est. value
Burnsville, MN

Last Updated 06/15/2023 09:33 AM
Project Title

Thompson Oaks River to River Greenway and Water Quality Design Project

Physical Address View project details and contacts
City, State (County) West Saint Paul, MN 55118   (Dakota County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $6,147,788 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project was awarded to Peterson Companies, Inc. in the amount of $6,147,788.06 Excavation of construction debris below former municipal golf course, comprehensive stormwater treatment system, concrete weir, concrete boardwalk over existing pond, trail construction and paving. Meet at Wentworth Library for prebid meeting. This project includes, but is not limited to tree removals, pond grading, soil remediation, concrete storm sewer, boardwalk construction, temporary and permanent erosion control, trail construction

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents