Similar Projects
APL Traffic Equipment
Term Contract
Post-Bid
Tallahassee, FL 32300

Traffic Monitoring Camera 2019A
Post-Bid
Port Saint Lucie, FL

Advanced Traffic Management System (ATMS), Implementation and Maintenance Services
Results
FL

Advanced Traffic Management System (ATMS)
Results
Tampa, FL 33601

Automated Traffic Signal Performance Measures (ATSPMs) Equipment
Term Contract
Results
Boca Raton, FL

Signalization Replacement at Intersection of US 1 and Lewis Point Road and St. Augustine South Drive
Results
Less than $454,770 est. value
Saint Augustine, FL 32086

Signalization Replacement at Intersection of US 1 / Shore Drive – HMGP 4283-012-R
Results
Less than $448,362 est. value
Saint Augustine, FL

Routine and Emergency Traffic Signal and Street Light Maintenance
Results
Palatka, FL 32177

Sumter County Repair and Maintenance of Traffic Signal Devices
Results
Less than $239,802 est. value
Wildwood, FL 34785

(MOT) Maintenance of Traffic Services Big Creek Project
Term Contract
Results
Clermont, FL 33585

Annual Traffic Loops Contract
Term Contract
Results
West Palm Beach, FL 33411

Traffic Signal and Roadway Lighting Services
Results
Less than $4,251,417 est. value
Tampa, FL 33601

Broadway Avenue /US 1 Mast Arm Installation Project
Results
Ormond Beach, FL 32175

Traffic Signal Information Technology Services (ITS)
Results
Less than $440,513 est. value
Tampa, FL 33601

Traffic Loop Detection Services
Results
Less than $464,859 est. value
Tampa, FL 33601

Last Updated 06/10/2020 08:43 AM
Project Title

East Johnson Avenue and Cody Lane Signalization Project

Physical Address View project details and contacts
City, State (County) FL   (Escambia County)
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists the furnishing and installation of mast-arm traffic signals and pedestrian signals and construction of a right turn lane, bicycle lane, sidewalk, resurfacing and/or reconstructing in portion or whole of the intersection of East Johnson Avenue at Cody Lane. This project will also include other work associated with the reconstruction of roadways such as maintenance of traffic, construction of curb and gutter, storm sewer system, stormwater pollution prevention, sod stabilization shoulder work, pavement striping, sanitary sewer force main relocation, etc. The contractor is to maintain traffic flow at all times, with minimal delays. Roadways are to have two-way traffic opened during all non-working hours. Closure of one lane will be allowed only during working hours. Contractor is to notify the residents no later than 48 hours prior to beginning work.

Details

Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents